Similar Projects
CTH D East
Infrastructure
Bidding
$525,000 est. value
Brackett, WI 54742

Longfellow Parking Lot And Playground
Renovation
Post-Bid
Eau Claire, WI 54703

North High School Parking Lot
Post-Bid
Eau Claire, WI 54703

Site Utility Distribution System Replacement - Phase 1
Results
$3,000,000 est. value
Eau Claire, WI

Hibbard Parking Lot Reconstruction - MEP
Results
$1,000,000 est. value
Eau Claire, WI 54701

Memorial High School Parking Lot Resurfacing
Infrastructure
Post-Bid
Eau Claire, WI 54701

Hibbard Parking Lot Reconstruction - GC
Results
Less than $1,000,000 est. value
Eau Claire, WI 54701

City Wide Alley Improvements
Results
Eau Claire, WI

Cannery District Street Improvements
Results
WI

City Wide Street and Utility Re-Construction
Infrastructure
Results
Eau Claire, WI

City Wide Street and Utility Reconstruction
Infrastructure
Results
Eau Claire, WI

Omaha Street Reconstruction
Infrastructure
Results
Eau Claire, WI 54703

City Wide Water Utility and Curb Replacement
Infrastructure
Results
Altoona, WI

City Wide Street and Utility Reconstruction
Infrastructure
Results
Eau Claire, WI

C. Eau Claire, North Crossing, Jeffers Road Intersection
Infrastructure
Results
WI

Last Updated 05/02/2022 04:36 PM
Project Title

Chippewa River Trail Phoenix to Grand Avenue Plaza

Physical Address View project details and contacts
City, State (County) Eau Claire, WI   (Eau Claire County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are requested consists of Removal of asphalt, unclassified excavation, preparation of subbase, 6-inch crushed aggregate base, 6-inch concrete sidewalk, removal of electrical conductors, removal of lighting control cabinet, set up new 100A electrical service, salvage lighting units, powder coat lighting units, reinstall lighting units, silt fence installation, restoration and landscaping.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents