Similar Projects
Hombre Circle Culvert Improvements and Cleaning
Bidding
Panama City, FL 32407

PCB Parkway Sidewalk (North Pier Park Drive to Nautilus Street
Bidding
Panama City Beach, FL 32413

Retention Pond Work Early Education
Renovation
Post-Bid
Panama City, FL

Callaway Point Drainage Improvement Project
Post-Bid
Callaway, FL 32404

North Glades and Hombre Drainage Improvements
Results
Less than $748,472 est. value
Panama City Beach, FL

Sea Oats - Drainage Improvements - Phase 2
Results
Less than $432,610 est. value
Panama City Beach, FL 32413

CEMIRT Construct New Parking Lot F/ Heavy Vehicles
Post-Bid
Panama City, FL 32403

Panama City Beach - Parking Lot Sealing and Crack Repair Frank Brown Park
Results
Less than $58,000 est. value
Panama City Beach, FL 32413

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

2020 National Resource Damage Assessment (NRDA) Artificial Reef Project
Results
Mexico Beach, FL

Safety Project/Traffic Signals/Roadway Signing
Results
Less than $812,740 est. value
FL

Eagle Drive Drainage Improvements
Results
Less than $96,500 est. value
Panama City, FL 32413

Sidewalk/Drainage Improvements/Turnout Construction and Base Work (BDI)
Results
Less than $961,137 est. value
FL

Wallace Road Sidewalk Construction Project
Results
Callaway, FL 32404

CR30 Front Beach Road Sidewalk Construction Project Phase I
Results
Panama City, FL 32401

Last Updated 07/29/2020 09:52 AM
Project Title

Bay Parkway Phase 2

Physical Address View project details and contacts
City, State (County) Panama City, FL 32413   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 01/17/20
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the construction of Bay Parkway Phase 2, the stormwater ponds and drainage system, sidewalks, forcemain, reclaimed water and the multiuse path. This project begins at the Bay Parkway Phase 1 terminus at Pier Park Drive will then travel east 1.56 miles and then travel south for 1.15 miles to connect into the existing Nautilus Street terminus. The Contractor shall provide all materials, equipment and labor to complete the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents