Similar Projects
2022 Materials
Infrastructure
Bidding
SD

Petroleum Products & Street Maintenance Materials
Post-Bid
Watertown, SD 57201

Crushed Gravel
Term Contract
Post-Bid
SD

Gravel for Sage Creek Rim Road, Badlands National Park
Results
Rapid City, SD

Freight on Board Asphalt Material
Results
Brookings, SD

Crushing Salvaged Concrete and Asphalt
Term Contract
Post-Bid
Yankton, SD

Road Salt
Term Contract
Results
Brookings, SD

Crushed Limestone
Post-Bid
SD

Cutback Asphalt, Emulsion Asphalt, Hot and Cold Mix, Plant Mix, Crack Sealant - Boxless, Mastic Sealant - Boxless, Pea Rock, Contracted Construction Equipment, Paver Laid Asphalt and Gravel Crushing
Post-Bid
SD

Bituminous Materials
Post-Bid
Aberdeen, Belle Fourche, Custer, Huron, Mitchell, Mobridge, Pierre, Rapid City, Sioux Falls, Watertown, Yankton, SD

Gravel Aggregate Materials
Term Contract
Post-Bid
SD

Asphalt Concrete Plant Mix Materials
Term Contract
Post-Bid
SD

Cutback Asphalt Road Oil
Post-Bid
SD

Recycled Asphalt and Concrete Crushing
Term Contract
Post-Bid
Mitchell, SD

Asphalt Rubble Grinding
Post-Bid
SD

Reported 11/25/2021 12:00 AM
Project Title

Petroleum Products and Street Maintenance Materials for Year 2022

Physical Address View project details and contacts
City, State (County) Watertown, SD   (Codington County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Hot mix and cold mix asphalt 2. Pit run gravel, crushed rock (gravel), crushed concrete, pea gravel, deicing sand, dirt, and rip rap 3. Gasoline & diesel fuel 4. Salt & calcium chloride 5. Cutting edges Bids for an indefinite amount of Class D, Type 2 hot mix asphalt material to be hauled by the City from the asphalt plant and for cold mix asphalt material to be hauled by the City from cold mix materials. Typically, the City would expect to use 1,200 ton of hot mix asphalt and 100 ton of cold mix asphalt per year. The asphalt materials purchased by the City are to be accumulated for the year 2022 and the contract will terminate December 31, 2022. The hot mix shall comply with South Dakota Department of Transportation specifications for Class D Material, Type 2, the asphalt cement shall be PG 58-28. Asphalt percentage shall be 6.5 to 7 percent. The City will coordinate quantities and material hauling, with the successful bidder. The cold mix asphalt material shall comply with South Dakota Department of Transportation specifications for Class D, Type 2 Aggregate Material; the asphalt used shall be MC-800, unless otherwise specified. Asphalt percentage shall be 6.5 to 7 percent. The City will haul the material from the successful bidder’s stock pile as required.

Details

Division 32 - Exterior Improvements, Flexible Paving.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents