Similar Projects
Pavement Milling, Ultra-Thin Wearing Course with Safety Improvements
Bidding
Dexter, Guilford, Sangerville, ME

Pavement Milling, Hot Mix Asphalt Overlay, Cyclical Pavement Resurfacing, with Drainage and Safety Improvements
Bidding
Blue Hill, Sedgwick, ME

Rehabilitate Eagle Lake Carriage Road at Acadia National Park
Post-Bid
$1,000,000 to $5,000,000 est. value
Bar Harbor, ME 04609

Hot Mix Asphalt Overlay with Safety Improvements
Results
ME

Pavement Milling, Cyclical Pavement Resurfacing, and Light Capital Paving
Results
Dexter, Dover-Foxcroft, Garland, Levant, Stetson, ME

Paving
Bidding
Hancock, ME

Pavement Milling, Cyclical Pavement Resurfacing and Hot Mix Asphalt Overlay
Results
ME

Placement of Plant Mix Recycled Asphalt Pavement, Hot Mix Asphalt Overlay, Drainage and Safety Improvements
Bidding

(LCP) Light Capital Paving
Results
Greenville, Monson, ME

(LCP) Light Capital Paving
Results

(LCP) Light Capital Paving And Maintenance Lot Paving
Results
Brooksville, Monroe, Prospect, Searsport, Sedgwick, Stockton Springs, Swanville, Winterport, ME 04986

On Call Maintenance Paving/Located in Regions 1-5
Results

(LCP) Light Capital Paving
Results
Bar Harbor, Columbia, Ellsworth, Gouldsboro, Hancock, Lamoine, Milbridge, Mount Desert, Orland, Southwest Harbor, Tremont, Trenton, ME 04605

Pavement Milling, Cold in-Place Recycling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements
Results
Sangerville, ME 04479

Pavement Milling, Hot Mix Asphalt Overlay with Safety Improvements
Results
Blue Hill, ME 04614

Last Updated 04/23/2020 03:35 AM
Project Title

Crack Sealing and Crack Repair

Physical Address View project details and contacts
City, State (County) Blue Hill, Dover Foxcroft, Orland, Sebec, ME 04614 (Hancock, Piscataquis Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Hancock and Piscataquis Counties: Priority 1 is located on Route 15 beginning 0.05 of a mile north of the Hinckley Hill Road in Blue Hill and extending northerly 7.99 miles to the intersection of U.S. Route 1 and State Route 15 in Orland. Priority 2 is located on Route 15 in Dover-Foxcroft beginning 0.97 of a mile north of intersection of Norton Hill road and extending northerly on Route 15 for 3.76 miles. Priority 3 is located on Route 6 beginning 0.15 of a mile northeast of intersection of Free Street in Dover-Foxcroft and extending northeasterly 6.40 miles. Ending at 0.3 of a mile west of interseclion ofMilo Road, Village Road and Stagecoach Road in Sebec.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents