Similar Projects
Toledo Self Serve Fuel Station
New Construction
Conception
Toledo, OH 43604

Blue Ash Towne Square Renovation
Renovation
Conception
$5,000,000 to $7,000,000 est. value
Cincinnati, OH 45242

Comfort Station Construction - CUVA
New Construction
Design
$1,000,000 to $5,000,000 est. value
Brecksville, OH

Main Street Beach Revitalization Project
Renovation - 720 SF
Design
$450,000 est. value
Vermilion, OH

Quirk ADA Restroom Project
Post-Bid
Cuyahoga Falls, OH 44223

Eden Place Accessibility Improvements
Renovation
Post-Bid
Circleville, OH 43113

Payne Community Park Restroom
New Construction - 200 SF
Results
$63 est. value
Payne, OH 45880

Muskingum River Parkway Flush Latrine Replacement
Results
$272,625 est. value
Zanesville, OH

New Community Plaza & Splash Park
New Construction
Construction
$1,000,000 est. value
Fredericktown, OH 43019

Shawnee State Park Campgrounds - Campground Phase 2 General Trades Package
Renovation - 11,870 SF
Construction
$7,500,000 est. value
West Portsmouth, OH 45663

Glenwood and Windsor Pool
Renovation, Alteration
Design
$10,000,000 est. value
Columbus, Obetz, OH 43207

Bathroom Remodel
Renovation
Post-Bid
Lakewood, OH 44107

Varsity Village Baseball Stadium Restroom Slab Restoration
Results
Less than $285,000 est. value
OH

Band Rehearsal Facility Ice Arena Renovations
Renovation - 16,460 SF
Design
Kent, OH 44242

Professional Design Services - Permanent Public Restroom Project
New Construction
Post-Bid
$875,000 est. value
Columbus, OH

Last Updated 05/27/2022 02:58 PM
Project Title

Willard Football Restroom Building

Physical Address View project details and contacts
City, State (County) Willard, OH   (Huron County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new toilet room building. Single whythe exterior walls made up of split face and ground face to match their existing concession and weight room building. Concrete floors, painted interior CMU walls and gypsum board ceillings. The roofing will be shingle with gutters and downspouts. There are splash blocks so no underground storm is on the project. The building does not have permanent heat or cooling but will have small units heaters in the toilet rooms for supplement heat during the football season. Code complaint lighting and electric. Site work will include a new sanitary and water line, site concrete, grading and seeding.

Details

Restroom/Bath House, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents