Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Full Service Design IDIQ
New Construction
Design

Library Design Consultant Services
New Construction, Infrastructure
Bidding
Lakewood, CO

Denver Federal Center New Laboratory Facility
Post-Bid
Lakewood, CO 80225

Engineering, Planning and Development
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Highway and/or Bridge Design and Engineering Services
Results
Less than $80,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Multifamily Housing (MFH) Construction Inspection Services Contract
Post-Bid

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Midtown Traffic Study & Safety Improvement's Design
Post-Bid

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Multi-Discipline Architect-Engineer Services Indefinite Delivery/Indefinite Quantity Contract, Unrestricted, For Renovation/Repair or New Construction of Facilities at Supported Installations Under Na
Post-Bid

Reported 06/21/2022 12:00 AM
Project Title

Morrison Main Street Revitalization

Physical Address View project details and contacts
City, State (County) Morrison, CO 80465   (Jefferson County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $417,330 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Morrison Main Street Revitalization Project will construct pedestrian improvements between Mt. Vernon Road and State Highway 74 along SH 8 through downtown Morrison. This project will build curb bulb outs, raised medians, and improved crossings to improve pedestrian safety and implement traffic calming measures. Curb ramps will also be constructed to improve the accessibility in the Town. This Project will also reevaluate parking and bicycle markings within the project limits.

Details

Division 07 - Thermal and Moisture Protection, Traffic Coatings, Pedestrian Traffic Coatings.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Schedules for Exterior Improvements, Schedules for Bases, Ballasts, and Paving, Pedestrian Walkway Schedule, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents