Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

The Charles Hotel - Compass Construction
New Construction, Infrastructure - 86,000 SF
Design
$34,000,000 CJ est. value
Kalispell, MT 59901

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

Blackfeet Reservation Apartment Complex, Browning MT
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Browning, MT 59417

Raw Water Intake, Pump Station, and Pipeline
New Construction, Infrastructure, Renovation
Bidding
$50,000 CJ est. value
Fort Smith, MT 59035

VRF Piping Replacement
Infrastructure
Post-Bid
Helena, MT 59601

Phase 6 Water System Improvements
Infrastructure
Post-Bid
Roundup, MT

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Taft Stockpile Site - Sand/Salt Cover Structure
New Construction, Infrastructure
Construction
$310,000 CJ est. value
Taft, MT 59867

Taco Bell Remodel - East Idaho Street / Kalispell
Infrastructure, Build-out
Pending Verification
$300,000 CJ est. value
Kalispell, MT 59901

Northwest Crossing Phase 1
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bozeman, MT 59715

Water Mains With Fowler Corridor Street Improvements - WIF58 - City of Bozeman
Infrastructure
Conception
$900,000 est. value
Bozeman, MT 59718

Last Updated 08/31/2022 11:14 AM
Project Title

27th Street Water Main Replacement

Physical Address View project details and contacts
City, State (County) Fort Benton, MT 59442   (Chouteau County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of approximately 900 lineal feet of 8-inch PVC water main, and all associated valves, fittings, fire hydrants, service lines, service connections, gravel and asphalt replacement. A Bidder may withdraw any proposal submitted prior to the hour set for the closing of the quotes provided the request is signed in a manner identical with the proposal being withdrawn. 4. The Owner will be responsible for payment in accordance with the terms of the Contract when the work is completed. 5. Bid Security 5.1 A Bid must be accompanied by Bid security made payable to Owner in an amount of ten percent (10%) of Bidder's maximum Bid price and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety authorized to do business in Montana. 5.2 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner's exclusive remedy if Bidder defaults. 5.3 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until seven days after the Effective Date of the Contract, whereupon Bid security furnished by such Bidders will be released. Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents