Similar Projects
Cedar Energy Center
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Chesapeake, VA 23323

The Commons
New Construction, Infrastructure
Conception
$140,000,000 CJ est. value
Chesapeake, VA 23323

Dominion North
New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Chesapeake, VA 23323

Townhomes at Jolliff Landing
New Construction, Infrastructure
Design
$4,500,000 CJ est. value
Chesapeake, VA 23321

Historic Williamson House Renovations
Infrastructure, Renovation
Bidding
$200,000 CJ est. value
Chesapeake, VA 23320

West Side Main Entrance Hangar Sites
Infrastructure, Renovation
Bidding
$390,000 CJ est. value
Chesapeake, VA 23321

Sam's Xpress Car Wash / Chesapeake
New Construction, Infrastructure - 4,114 SF
Post-Bid
$1,500,000 CJ est. value
Chesapeake, VA 23322

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Deep Creek Bridge Replacement
Demolition, New Construction, Infrastructure
Results
$59,565,868 CJ est. value
Chesapeake, VA 23320

Wawa #8668
New Construction - 6,049 SF
Construction
$1,470,676 est. value
Chesapeake, VA 23323

Centerville South Solar Farm
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesapeake, VA 23322

Centerville South Solar Farm
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesapeake, VA 23322

Strickland Express Oil Change Facility
New Construction
Conception
Chesapeake, VA

Oakdale Area BMP and Drainage Improvements - 09-150 - City of Chesapeake
Infrastructure
Design
$4,500,000 CJ est. value
Chesapeake, VA 23320

Last Updated 03/20/2023 04:41 PM
Project Title

Convenience store with gas station

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23320   (Chesapeake City County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 20, 2023, a building permit has not been submitted for review for this project. This project is expected to be a convenience store with a gas station, with a small shopping area as well. No timeline for construction is currently available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents