Similar Projects
Reported | 10/27/2020 12:00 AM |
Project Title | Robinson Dam Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Blaine, ME (Aroostook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of the rehabilitation of the Robinson Dam located along the Prestile Stream in Blaine, Maine. The existing timber crib dam is in current disrepair and will be reconstructed. The work shall consist of removal of the existing timber cribbing to a stable base, reconstruction of the timber crib dam and reinstallation of existing stone ballasts, replacement of approximately 1,400 SF of timber decking, replacement of training walls installation of a liner on the upstream face of the dam and site/slope stabilization and placement of rip rap. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |