Last Updated | 08/08/2022 10:33 AM |
Project Title | San Juan Lateral Water Treatment Plant (SJLWTP) |
Physical Address | View project details and contacts |
City, State (County) | Waterflow, NM 87421 (San Juan County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2024 |
Bids Due | View project details and contacts |
Estimated Value | $230,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 8, 2022, this project has been delayed to 2023. Although a firm timeline for construction has not been determined, construction is not expected to start prior to 2024. This is not a solicitation but rather a Sources Sought Synopsis to determine potential sources for information and planning purposes only. The purpose of this Sources Sought is to conduct market research to determine if responsible sources exist, and to assist in determining if this effort can be competitive. The proposed North American Industry Classification Systems (NAICS) Code is 237990 which has a corresponding Size standard of $36.5M annual average revenue. The Government will use this information to determine the best acquisition strategy for this procurement. The Bureau of Reclamation (Reclamation), a water management agency within the Department of the Interior desires to engage the water treatment industry to provide a clear, concise, fair, and reasonable approach to the procurement strategy regarding the design and construction of the San Juan Lateral Water Treatment Plant (SJLWTP). The SJLWTP is part of the Navajo-Gallup Water Supply Project (NGWSP), whose overarching mission is to convey a reliable municipal and industrial water supply from the San Juan River to the eastern section of the Navajo Nation, southwestern portion of the Jicarilla Apache Nation, and the city of Gallup, New Mexico via about 300 miles of pipeline, several pumping plants, and two water treatment plants. BOR seeks to further its mission for the NGWSP through a traditional (firm-fixed) design-build procurement strategy of the SJLWTP in conformance with the two-step process identified in Federal Acquisitions Regulations, Subpart 36.3 Two Phase Design-Build Selection Procedures. Phase One will be a merit/qualifications-based selection, while Phase Two will focus primarily on cost and technical approach (see attached draft Sections L and M for Phase One and Phase Two evaluation criteria) based on an approximate 30% design level with the Phase Two Proposal. The SJLWTP design-build contract incorporates an initial 22.0 million gallons per day (MGD) water treatment plant, expandable in the future to 37.6 MGD, with six months of operations and maintenance included in the proposed initial award. The SJLWTP will receive pretreated surface water from the San Juan River via Reaches 1 3 (designed by BOR and constructed by others) and will deliver treated water to the Reach 4a transmission pipeline (designed by BOR and constructed by others) serving multiple entities. The SJLWTP project scope will involve the design and construction for the work within the plant yard for which no design has yet been performed. Strategy Overview/Schedule of Projected Events: The purpose of the Sources Sought Notice, request for information questions below, and the Industry Day is to gather industry information from interested parties, which is deemed essential as part of Reclamations collaborative planning process for the design-build procurement of the SJLWTP. A brief milestone schedule is proposed below for the BOR planned procurement strategy for this contract in fiscal year 2019 to provide a basis for this RFI: Pre-solicitation with Sources Sought and RFI/Industry Day Details Issued - August 24, 2018 Industry Day in Albuquerque, NM September 26 and 27, 2018 Q&A Posting Responses to Industry Day Questions Projected October 11, 2018 (These responses will consist of the Government answers to questions received during the one-on-one meetings.) Synopsis to Industry of Upcoming Two-Step Solicitation Projected December 3, 2018 Phase One Request for Qualifications (RFQ) Solicitation Projected to be Issued - January 10, 2019 Phase One Statement of Qualifications Projected to be Due - February 21, 2019 (42 days to respond) Phase Two Solicitation Request for Proposals (RFP) Projected to be Issued to Top 3 Shortlisted Offerors - March 14, 2019 Phase Two Proposals Projected to be Due - July 2, 2019 (110 days to respond) Phase Two Oral Interviews with Shortlisted Firms Projected Week of July 15, 2019 Negotiations with Selected Offeror Complete and Project Award and Notice to Proceed Issued - September 12, 2019 Contract Substantial Completion with Delivery of Treated Surface Water to Downstream Transmission System Need Date of Approximately March 29. 2024 (1,660 days from NTP) Contract Final Completion after 6-Month Operation and Maintenance of WTP Need Date of Approximately September 29, 2024 Industry Day Details: Reclamation announces an Industry Day for any entity or entities interested in designing and building the SJLWTP. Industry Day will be held at the U.S. Department of the Interior National Indian Programs Training Center (NIPTC) at 1011 Indian School Road NW in Albuquerque, NM September 26 and 27, 2018 Industry Day Schedule Wednesday, September 26, 2018 1:00 pm 1:30 pm Registration 1:30 pm 3:15 pm Plenary Session Presentation 3:15 pm 3:30 pm Break 3:30 pm 5:00 pm Questions & Answers & Wrap Up Thursday, September 27, 2018 8:00 am 11:30 am Individual Meetings* 11:30 am 12:30 pm Break 12:30 pm 3:00 pm Individual Meetings* To register to attend the Plenary Session on September 26, 2018, please RSVP to Mr. Ashton Jones at ajones@usbr.gov. To schedule an individual meeting on September 27, 2018, please RSVP and provide the Requested Information below to Mr. Ashton Jones at ajones@usbr.gov and carbon copy (CC) Mr. Bart Deming at bdeming@usbr.gov by September 12, 2018 NLT 4PM MST. Each one-on-one appointment will be 30 minutes in duration. Responses are requested but not required. No award will be made off the responses provided as this is not a solicitation notice. The provided information may or may not affect the projected acquisition strategy. If providing information please keep the responses short, concise, and to the point. Only provide expanded information if the providing entity finds the information valuable. Lengthy, verbose responses are not required or desired. Please limit the total response to no more than 5 pages. If you have technical questions concerning this opportunity please contact: Bart Deming, USBR Four Corners Construction Office (FCCO), bdeming@usbr.gov. Contracting Office Address: Bureau of Reclamation Upper Colorado Region Regional Office 125 South State Street, Room 8100 Salt Lake City UT 84138 US The estimated magnitude of this project is estimated at $230,000,000.00 |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |