Similar Projects
Rolston Park Pier Replacement
Infrastructure
Bidding
$420,000 est. value
Coden, AL 36523

Desoto Boat Ramp Go Mesa Project G-DIHMA/19/DI
Post-Bid
Dauphin Island, AL 36528

Alabama Cruise Terminal SPBB Gangway Improvements
Infrastructure
Post-Bid
Mobile, AL 36602

Boardwalk Construction at Graham Creek Nature Preserve
Results
$110,862 est. value
Foley, AL

Roland Cooper State Park Transient Dock Installation
Results
$269,900 est. value
Camden, AL 36726

Tom Jackson Pier Replacement and B.B. Comer Pier Addition
Infrastructure
Post-Bid

Lincoln Tournament Fishing Park Building Boardwalk and Pier Package
Results
$1,800,000 to $2,200,000 est. value
Lincoln, AL 35096

Gulf State Park Pier Structural and Electrical Repairs
Infrastructure, Alteration
Post-Bid
Gulf Shores, AL 36542

Improvements and Repairs to Marine Resources Boat Slips 1 and 2
Results
$1,653,000 est. value
Dauphin Island, AL

Construction of 4 New Inshore Reefs Limestone Aggregate and the Installation of 16 Pilings
Infrastructure
Post-Bid
$200,000 est. value
Dauphin Island, AL

Wooden Pier Repairs
Results
Fairhope, AL

D'Olive Bay Boat Launch
Infrastructure
Post-Bid
$300,000 est. value
Daphne, AL

Eastgate Boardwalk Repairs
Results
Ashford, AL 36312

Berth 2 Fender Refurbishment
Infrastructure
Post-Bid
$230,000 est. value
Mobile, AL 36602

Intracoastal Waterway Boat Launch
Results
Bay Minette, AL

Last Updated 06/13/2022 12:57 AM
Project Title

Waterfront Park Pier Post-Hurricane Sally Repairs

Physical Address View project details and contacts
City, State (County) Orange Beach, AL 36561   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 to $800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of repairing the pier located at Waterfront Park, also known as Orange Beach Canoe Trail Site 3. The project consists of repairs to the pier including full replacement of all piling, framing, decking, roofing, plumbing, electrical, lighting, and all incidental work.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents