Similar Projects
Perris Downtown Skills Training and Job Placement Center
New Construction, Infrastructure - 27,422 SF
Bidding
$7,500,000 CJ est. value
Perris, CA 92570

Library Technology Center (LTC) and Gym HVAC and Roof Replacements Project - Monterey Peninsula College
Renovation
Bidding
$4,000,000 CJ est. value
Monterey, CA 93940

Minor Concrete Repair Services
Term Contract
Sub-Bidding
$300,000 CJ est. value
El Centro, CA 92243

On-Call Asphalt and Concrete Repair Services
Term Contract
Sub-Bidding
$1,000,000 CJ est. value
Newport Beach, CA 92663

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

2 Inmate or Ward Labor Program Concrete Pumping Services
Alteration
Post-Bid
$6,995,500 est. value
Sacramento, CA

Replace Jointed Plain Concrete Pavement
Alteration
Results
$3,800,000 est. value
CA

Construct Pervious Concrete,Minor Concrete,HMA and Modify Landscape
Alteration
Results
$880,000 est. value
San Diego, CA 92104

Bastanchury Road Improvements from Casa Loma Avenue to Eureka Avenue (Interconnect from valley view avenue to lakeview Avenue)
Infrastructure
Bidding
$7,000,000 CJ est. value
Yorba Linda, CA 92886

BC Welcome Center Concrete Slab on Grade Corrections and Replacement
Alteration
Post-Bid
Bakersfield, CA 93314

Hemet Concrete Repairs
Alteration
Results
Hemet, Riverside, CA 92507

Residential Slurry Seal
Infrastructure
Bidding
$1,200,000 CJ est. value
Mission Viejo, CA 92692

California Highway Patrol (CHP) Contra Costa Area office - Concrete Pad Installation Services
Term Contract
Post-Bid
Martinez, CA 94553

Omnibus Concrete Repairs
Alteration
Results
$450,000 est. value
Santa Ana, CA 92799

Wells 206, 207, 208 and 209 Raw Water Conveyance Pipelines - Phase 2
Infrastructure
Bidding
$400,000 CJ est. value
Moreno Valley, CA 92553

Last Updated 09/23/2022 04:08 AM
Project Title

Pardee Recreation Area and Pardee Center Water Treatment Plant Improvements

Physical Address View project details and contacts
City, State (County) Valley Springs, CA 95252   (Calaveras County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,099,811 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PN-19587.02 Estimated Cost: $2,500,000 to $3,500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. After the Pardee Center tour, the group will travel individually over to Pardee Recreation Area Water Treatment Plant. This is the only time that the Treatment Plants will be open for inspection. The inspection will last approximately 1 hour at each site. No photography by the Attendees will be allowed. The District will take photographs, as requested by the Attendees, restricted to the work zone. The District will release photographs to Attendees after the bid walk, pending review by the District. All Attendees are required to have a photo ID and sign a confidentiality agreement not to share, sell, or publish photos. The Prime Contractor and its subcontractors are strongly encouraged to attend the jobsite inspection where a "sign-in" sheet will be provided. Requirements of the District's Contract Equity Program including the Local Hire component will be discussed and explained at the jobsite inspection. For jobsite inspection questions only, call Ben Townley at (510) 287 2147. Pardee Recreation Area Water Treatment Plant: Work includes removal and disposal of the existing ultra-filtration water treatment skid module, pumps, piping, and appurtenances; installation of a new ultra-filtration water treatment skid module, two new backup up generators, pumps, piping, electrical, controls; start-up and calibration of the new treatment system and perform required testing. Pardee Recreation Area Water Treatment Plant Dechlorination System Improvements: Work includes the removal and disposal of the existing wastewater dechlorination system (tablet feeder system, connection between backwash holding tank and underground contact tank, utility vaults) and improvements to the effluent sample building, new captor dechlorination system, new electrical and dosing pump, consolidate and verify controls routing and communication to SCADA; provide eye washing station and spill prevention kits. Pardee Center Water Treatment Plant: Work includes removal and disposal of the existing nano-filtration water treatment skid module, pumps, piping, and appurtenances; installation of a new nano-filtration water treatment skid module, pumps, piping, electrical, controls; start-up and calibration of the new treatment system and perform required testing.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents