Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

College Area Sewer and AC Water Main Replacement
Alteration
Bidding
$13,440,000 est. value
San Diego, CA

Sewer and AC Water Group 765A
Infrastructure
Bidding
$16,300,000 est. value
San Diego, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Tempered Water Line Replacement Services
Infrastructure
Bidding
$200,000 est. value
CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Replace Drakesbad Water Main/Access Road, NPS-Lavo
Term Contract
Bidding
$250,000 to $500,000 est. value
Chester, CA 96020

Trinidad Fire Station - Potable Waterline Installation or Connection
Infrastructure
Post-Bid
Trinidad, CA 95570

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

San Joaquin Pipeline Valve and Safe Entry Improvements - Phase 1B
Infrastructure
Bidding
$14,000,000 est. value
Stockton, CA

Last Updated 05/13/2022 11:59 PM
Project Title

3 Water Cogeneration Cooling Line Replacement

Physical Address View project details and contacts
City, State (County) Santa Cruz, CA 95060   (Santa Cruz County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all labor, materials, tools, equipment, and transportation required to complete the Project, with a scope of work to generally include, but is not limited to the following: Replacement of the existing 4" 3 Water low pressure (3WLP) ductile iron pipe with a new 6" 3WLP C900 PVC pipe at the Santa Cruz Wastewater Treatment Facility (WWTF) from Digesters 2 & 3 to the Cogeneration Building, installation of new valves, cleanouts, and all necessary fittings, adapters and couplings, and the implementation a bypass system for the 3 Water to maintain function of the cogeneration generators during construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents