Similar Projects
External Tank Inspection - Air Force Academy Colorado
Bidding
CO

Magnesium Chloride Tanks - Kersey & Greeley
Bidding
CO

12K Tanks
Post-Bid
CO

21 K Fiber Glass Tanks
Post-Bid
CO

Put Hill Finish Water Storage Tank
Results
Pagosa Springs, CO

Miscellaneous Pipe Coating and Tank Repair 2019
Results
Less than $150,000 est. value
Loveland, CO

CTF CDOC Fuel Tank Repairs BP1 DQ1 CMS163766
Bidding
$100,000 est. value
Denver, CO

Stock Water Pipeline and Bottomless Tanks
Post-Bid
Sterling, CO 80751

3rd Party Natural Gas Services
Results
Grand Junction, CO

Central Platte Campus CNG Feuling Complex Maintenance and Repair Services
Term Contract
Post-Bid
Denver, CO 80223

Catamount Ranch Water Tank Improvement
Results
Steamboat Springs, CO

Cde Ten Well Plugging Project
Post-Bid
Denver, CO

Aspen Maintenance Facility Phase 9 Fuel Tank Replacement
Results
Aspen, CO 81611

Romo Temporary Fuel Tank Hookup
Post-Bid
Estes Park, CO 80517

Fuel Island Expansion for LPG Autogas
Results
Thornton, CO 80240

Last Updated 07/30/2020 05:23 PM
Project Title

2015-143M19/Replace Steam Lines

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO   (El Paso County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $432,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is phase 2 to the work that was performed in 2007 to replace the steam and condensate piping. Continuing from the phase 1 work, the steam system piping that leads in the Early Education Center (EEC) and continues to the Gym shall be replaced and insulated. Another portion of pipe that distributes to the Jones and Palmer building, from the Argo Building, shall be replaced. All the new piping shall be insulated, though presently much of this piping is not presently insulated, and get new expansion joints and general pipe supports. All of this piping is either in utility tunnels or in maintenance basements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents