Similar Projects
Masterson Station Park Electrical Primary Conductor Replacements
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Lexington, KY 40511

Solar Lighting for Bus Shelters
Post-Bid
Owensboro, KY 42301

Electrical Modifications
Post-Bid
Middlesborough, KY

Switchgear Replacement at Jeffersontown High School
Results
Jeffersontown, KY 40299

Dosker B Building Electrical Upgrades
Results
Louisville, KY

Upgrade 480V Electrical System
Post-Bid
$500,000 to $1,000,000 est. value
Louisville, KY

Site Lighting Replacement at Conway Middle School
Results
Louisville, KY 40258

Downtown Street Light Equipment
Alteration
Post-Bid
Lexington, KY

UK PAV A Central Sterile Sink
Addition
Results
$55,000 est. value
Lexington, KY

Electric Power Transmission and Distribution Franchise
Alteration
Post-Bid
Ashland, KY

Emergency Generator Replacement Phase II
Results
$66,500 est. value
Hopkinsville, KY 42240

Torres Lighting Equipment
Alteration
Post-Bid
Lexington, KY

Emergency Generator Phase I
Results
$70,000 est. value
Ashland, KY 41102

Field Hockey and Lacrosse LED Display Improvements
Alteration
Post-Bid
Louisville, KY 40209

Improve Electrical Infrastructure - Ag Complex
Results
Less than $6,100,000 est. value
Lexington, KY

Last Updated 09/07/2022 08:33 AM
Project Title

FSS HSB Lighting Replacement

Physical Address View project details and contacts
City, State (County) Frankfort, KY 40601   (Franklin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $540,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The bid documents apply to the existing Health Services building in Frankfort, KY. The scope of the project's base bid, is to retrofit existing light fixtures to LED relight fixtures with occupancy and dimming control for the upper floors. Alternate #1 includes a sound masking system for the open office areas of the 2nd & 3rd floor. Each project increment includes the associated (lighting and/or sound masking) controls to be fully installed, programmed, and operationally tested by a certified installing technician for lights and a factory certified representative for the sound masking system. The system programming technician shall support verification testing by the engineer and perform owner training at a time acceptable to the owner.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents