Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pumalo Street Townhomes
New Construction, Infrastructure
Design
$4,500,000 est. value
San Bernardino, CA 92404

Joslyn Senior Center Renovation
Renovation, Infrastructure
Bidding
$597,958 CJ est. value
Redlands, CA 92373

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

Gravel Mulch, Rock Blanket, and Imported Borrow
Infrastructure
Sub-Bidding
$5,900,000 CJ est. value
Needles, CA 92363

CSA 70, R-40 Upper North Bay Road Chip Seal Project
Infrastructure
Sub-Bidding
$70,000 CJ est. value
San Bernardino, CA 92352

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

Starbucks - East Highland Avenue / San Bernardino
New Construction, Alteration - 928 SF
Pending Verification
$300,000 est. value
San Bernardino, CA 92404

San Bernardino County Transportation Tunnel
New Construction, Infrastructure
Pending Verification
$492,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Last Updated 08/02/2022 12:03 PM
Project Title

Stanfield Boardwalk Improvements Project

Physical Address View project details and contacts
City, State (County) Big Bear City, CA 92314   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $853,150 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 29, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** This project generally includes the removal of existing wood decking and wood rails of a 2100 linear feet of boardwalk, and installation of new decking and railing according to the construction plans. Liquidated Damages: 500 Project Duration: 60 Days Bid Bond: 10.00% Payment Bond: 100.00% Performance Bond: 100.00% Q&A Deadline 07/11/2022 5:00 PM (PDT)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents