Similar Projects
Last Updated | 08/28/2023 12:08 PM |
Project Title | Riverview PAM Rehab Hospital Bid Package |
Physical Address | View project details and contacts |
City, State (County) | Riverview, FL 33569 (Hillsborough County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Hospital, Paving/Reconstruction, Site Development |
Contracting Method | Bids by Invitation |
Project Status | All Bids Received, Selection Underway, Construction start expected February 2024 |
Bids Due | View project details and contacts |
Estimated Value | $29,000,000 [brand] Estimate |
Plans Available from | General Contractor |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | New construction of a 1 story 49,700 sqft post acute medical rehabilitation hospital in Riverview, FL. Plans are based on Henderson, NV plans/specs which are attached. Scope includes but is not limited to: concrete; masonry; structural steel; metal framing; rough carpentry; thermal & moisture protection; glazing; doors/hardware; flooring; acoustical; fabric wall systems; specialties; foodservice equipment; furnishings; integrated x-ray shielding assemblies; fire suppression; MEP; low voltage; electronic safety & security; site work; and site utilities. If you are aware of any specific Florida requirements due to being in Riverview, please account for them. As of August 28, 2023, the owner has placed the project on hold. It is unknown when it will come back out. Otherwise please account for the 10 specific items listed below: Roof top screening - no screening - reduce screening by 50%; by 75% or to just enclose large RTU units - no small fans behind screening Roof top screen material - steel post will remain but wind load will be factor - need to check any hurricane codes Exterior finishes - price 50% masonry brick - 50% EIFS no pattern just standard color Landscaping - Allowance Remove and do not price the Canopy over the therapy garden Monument sign by Tenant Mechanically fastened TPO roof Drywall is not to be "impact resistant" All low voltage by tenant - back boxes by electrician On exterior no patterned thin brick make more mono uniform Although a firm timeline for construction has not been determined, construction is not expected to commence prior to Winter 2024. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 49,700 SF.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |