Similar Projects
Last Updated | 05/14/2021 10:27 AM |
Project Title | Pine Acres Lake Dam Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Hampton, CT 06247 (Windham County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,353,111 |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Includes but is not limited to: the placement of supplemental riprap on the upstream slope of the dam, re-gradation of the crest of dam to a uniform elevation, re-gradation of the downstream slope and the installation of turf reinforced mats on this embankment for overtopping protection, concrete repairs to the primary spillway; replacement of the bridges spanning the primary and auxiliary spillways, installation of a new trash rack at the upstream side of the primary spillway, replacement of the low level outlet gate, replacement of existing wood stop logs with new aluminum stop logs, replacement of the existing weir and training walls at the auxiliary spillway with concrete weir and training walls, installment of a toe drain system, and clear trees on and within 25 feet of the dam. |
||||||||||||
Details | Dam/Tunnel, Renovation.
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |