Project Title

Pine Acres Lake Dam Rehabilitation

Physical Address View project details and contacts
City, State (County) Hampton, CT 06247   (Windham County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,353,111
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Includes but is not limited to: the placement of supplemental riprap on the upstream slope of the dam, re-gradation of the crest of dam to a uniform elevation, re-gradation of the downstream slope and the installation of turf reinforced mats on this embankment for overtopping protection, concrete repairs to the primary spillway; replacement of the bridges spanning the primary and auxiliary spillways, installation of a new trash rack at the upstream side of the primary spillway, replacement of the low level outlet gate, replacement of existing wood stop logs with new aluminum stop logs, replacement of the existing weir and training walls at the auxiliary spillway with concrete weir and training walls, installment of a toe drain system, and clear trees on and within 25 feet of the dam.

Details

Dam/Tunnel, Renovation.
Division 01 - General Requirements, Site Construction Performance Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Metal Railings.
Division 11 - Equipment.
Division 31 - Earthwork, Grading, Excavation and Fill, Subgrade Preparation, Excavation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts