Similar Projects
RFP Design - Boiler Replacements at 279 and 305 Perry Street
Renovation
Conception
$200,000 CJ est. value
Buffalo, NY 14210

Valley View Center for Nursing Care Addition - RTU
Alteration
Design
Greenvale, NY 11548

Auburn Community Hospital - Cancer Center
New Construction - 12,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Auburn, NY 13021

Provide Addition - HVAC Work
Addition, Demolition, Infrastructure
Sub-Bidding
$100,000 CJ est. value
Morrisville, NY 13408

Cooling and Heating Inspections for Four (4) Stultz Units Services
Term Contract
Sub-Bidding
Syracuse, NY 13210

1311 BSNY Chiller Replacement (NIA)
Post-Bid
Lewiston, NY 14092

Filters
Post-Bid
NY

HVAC Repairs, Rehabilitation and Installation
Term Contract
Results
Lake George, NY 12845

HVAC Inspection and Repair Services
Term Contract
Results
Syracuse, NY

Johnstown Community Health Center - Accessibility and Toilet Room Renovations
Renovation - 1,280 SF
Construction
$400,000 est. value
Johnstown, NY 12095

Replace Fire and Smoke Doors
Renovation
Design
$1,000,000 to $5,000,000 est. value
Northport, NY 11768

Building Heating System Replacement
Post-Bid
Morrisville, NY

Upgrade Controls and Heating System at Taberg RC Center for Girls
Alteration
Results
$250,000 to $2,000,000 est. value
Taberg, NY 13471

City Harbor Phase 2
New Construction, Infrastructure - 60,000 SF
Design
$65,000,000 CJ est. value
Ithaca, NY 14850

Heating Unit Replacements
Renovation
Post-Bid
Albany, NY 12203

Last Updated 08/11/2022 04:09 PM
Project Title

Provide Facility Closure - Willard Drug Treatment Center - HVAC

Physical Address View project details and contacts
City, State (County) Willard, NY 14588   (Seneca County)
Category(s) Medical, Single Trades
Sub-Category(s) HVAC, Medical Office/Outpatient
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Provide Facility Closure - Willard Drug Treatment Center - HVAC MWBE Goal M - W 0% - 0% SDVOB Goal 0% Estimated Cost $500,000 - $1,000,000 Bid Deposit $37,900 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents