Similar Projects
AW Family Aquatic Center Roof Replacement - 23072- City of Davenport
Infrastructure
Conception
Less than $150,000 est. value
Davenport, IA 52803

Removal and Replacement of AHU-1 Chilled Water Coils
Alteration
Bidding
$25,000 to $100,000 est. value
Ames, IA 50010

Iowa Advanced Technology Laboratories - Recommission VAV Units / Install Ceiling Tiles / Install AMAG Card Reader in Room 196
Alteration
Bidding
$82,300 est. value
Iowa City, IA 52245

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Residential Roof Removal and Replacement
Alteration
Results
IA

Removal and Replacement of Two Air Supply Units
Alteration
Results
$250,000 est. value
Davenport, IA 52801

Laboratory Freezer
Alteration
Post-Bid
Davenport, IA

Building S-34 Vehicle and Welding Exhaust Upgrades
Alteration
Results
Johnston, IA

2022 Roof Replacement at Gaylord Smith Building
Alteration
Post-Bid
Sioux City, IA 51106

Data Room HVAC Installation at CSC
Alteration
Results
Cedar Rapids, IA

IWCC - Looft Hall AHU Replacement
Alteration
Post-Bid
Council Bluffs, IA 51503

Modern Woodmen Park HVAC and Event Center
Alteration
Results
Davenport, IA 52802

I-35 Schools - HVAC Renovations
Alteration
Post-Bid
Truro, IA 50257

Fire Station Roof Replacement
Alteration
Results
Less than $76,220 est. value
Anita, IA 50020

Last Updated 06/28/2022 10:41 PM
Project Title

Administrative Services Building HVAC System Conversion

Physical Address View project details and contacts
City, State (County) Ames, IA 50011   (Story County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,049,650
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to, the replacement of the building roof and removal of the underperforming HVAC system from the roof, replacing it with a new mechanical room building, new energy efficient air handling system, and connection to the adjacent campus chilled water system. This project includes removal of the existing HVAC system, connection to the campus chilled water loop, construction of a new two-story mechanical room on the west side of the building, installation of new air handling equipment, cooling coils and associated components, replacement of the existing ASB roof system, relocation of the existing emergency generator. All the work associated with this will require a phased approach and the new system must be operational prior to the removal of the existing HVAC systems. Questions regarding the scope of work should be directed to Bruce Bonestroo of Facilities Planning and Management, Phone: 515-294-1995, E-mail: bbonestr@iastate.edu.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents