Similar Projects
Chemical System Maintenance Phase I
Infrastructure
Bidding
$325,000 est. value
Raleigh, NC

Replace Natural Gas Piping (House Piping)
Post-Bid
Weldon, NC 27890

Former Police HQ Building - Underground Storage Tank Closure
Post-Bid
Raleigh, NC 27601

Boat Refueling System Repairs for the U.S. Coast Guard (USCG) Station Hatteras Inlet
Results
Hatteras, NC 27943

Underground Utility Locating
Term Contract
Results
Raleigh, NC 27610

Petroleum Tank Installation, Operations and Maintenance Services
Term Contract
Post-Bid
Charlotte, NC 28206

Underground Utility Repair
Term Contract
Results
Raleigh, NC 27610

Fuel Storage Tanks
Term Contract
Post-Bid
Raleigh, NC 27699

Fuel Equipment Upgrades
Results
Greensboro, NC 27405

Liquefied Petroleum Gas & Tank Monitoring Services
Post-Bid
Jacksonville, NC 28542

New Fuel Farm - Fuel Systems
Results
Beaufort, NC 28516

Maintenance Fuel Facility Secondary Containment Bid Package
Post-Bid
Raleigh, NC

Diesel Fuel Tank Cleaning and Fuel Recovery Services
Term Contract
Results
Wilmington, NC

Fuel Removal and AST STI SP0001 External Inspection at Military Ocean Terminal Sunny Point
Post-Bid
Southport, NC

Fuel Oil Tank Protective Coating - Central Heat Plant
Results
Raleigh, NC 27699

Last Updated 09/27/2021 03:22 PM
Project Title

Ogden Park Elevated Water Tower Rehabilitation

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28403   (New Hanover County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $515,000 to $520,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents