Similar Projects
Groh Farm Residential Development Phase 1
New Construction, Infrastructure
Conception
Mankato, MN

Agate Trail Apartments Phase I
New Construction
Conception
Inver Grove Heights, MN 55077

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Humboldt Athletic Improvements
Renovation
Bidding
Saint Paul, MN 55107

Community Athletic Fields Parking Lot
New Construction
Bidding
$200,000 est. value
Mankato, MN 56001

Alpine Park Off Leash Area Expansion
Post-Bid
Anoka, MN

Athletic Surfaces: Tracks and Courts
Term Contract
Post-Bid
MN

Field Reconstruction ISD 11 High School Stadiums
Results
Anoka, MN 55303

New Splash Pad at Phelps Field Park
Results
Minneapolis, MN 55407

Amber Fields Mixed Use Development
New Construction, Infrastructure - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Rosemount, MN

Thomas Park Reconstruction
Renovation
Bidding
Mankato, MN

New Synthetic Turf Fields and Track Eastview High School
Post-Bid
Apple Valley, MN 55124

Hok-Si-La Park Recreation Trail
Results
$443,508 est. value
Lake City, MN

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Last Updated 04/28/2022 12:26 PM
Project Title

Tischer Creek Hartley Trail Crossing

Physical Address View project details and contacts
City, State (County) Duluth, MN 55803   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to replace two undersized culverts under Hartley Trail with a 21’-3”, single span bottomless culvert. The Work entails removal and disposal of existing structures, temporary stream diversion, and installation of aggregate culvert footings and rip rap stream bed material. Additional work includes construction of a cross vane structure, removal and disposal of concrete debris from the stream channel, and clearing of two stream access areas.

Details

Park/Playground, New Construction.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents