Similar Projects
Middle Creek Regional Wastewater Pump Station, Force Main and Interceptor Sewer
New Construction
Bidding
Apex, NC 27539

Winding Pine Pump Station
New Construction
Bidding
$5,000,000 est. value
Cary, NC

Poplin Road Pump Station Interim Improvements - Design Build Contract
Post-Bid
Monroe, NC 28112

Public Safety Building Lift Station
Post-Bid
Atlantic Beach, NC

Groometown Road Water Booster Station
Results
Greensboro, NC

Booster Pump Stations #1 and #2 Rehabilitation Project
Results
Troy, NC 27371

Leith Creek WWTP Influent Pump Station Improvements
Renovation
Bidding
$7,060,000 est. value
Laurinburg, NC 28352

French Broad River Intake Pump Station Project
Post-Bid
$10,000,000 to $15,000,000 est. value
Hendersonville, NC 28792

Frances Haven and Farmington Pump Station Decommissioning
Results
Less than $500,000 est. value
Harrisburg, NC 28075

Landfill Convenience Center Redevelopment
New Construction, Renovation
Bidding
Wilmington, NC 28401

Highway 75 Booster Pump Replacement
Term Contract
Post-Bid
Monroe, NC 28112

Wastewater Pump Station and Sewer System Improvements
Results
Grifton, NC 28530

Little Creek Wastewater Transmission Pump Station Improvements Project
New Construction
Bidding
Clayton, NC

Waxhaw Gravity Interceptor, Pump Station and Force Main
Post-Bid
$6,000,000 to $7,000,000 est. value
Monroe, NC

Lift Station Pump
Results
Greensboro, NC 27401

Last Updated 02/02/2022 10:06 AM
Project Title

Sewer Pump Station No. 1 Improvements

Physical Address View project details and contacts
City, State (County) Walnut Creek, NC 27534   (Wayne County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $524,959
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall include installing Contract No. 1— Pump Station No. 1 (temporary sewer bypass system, 176 gpm duplex submersible sewer pump station replacement with wet well and valve vault, site work, permanent generator, and appurtenances); Contract No. 2 — Sewer System Rehabilitation (manhole rehabilitation and sanitary sewer main rehabilitation).

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents