Similar Projects
Reported | 04/14/2021 11:33 PM |
Project Title | Don Bishop Road Cross Drain Replacement |
Physical Address | View project details and contacts |
City, State (County) | FL (Walton County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | |
Project Status | Abandoned |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed activities will consist of replacing corrugated metal culvert pipes and headwalls with a new aluminum box culvert and round relief pipes within the rights-of-way of Don Bishop Road in Walton County. Additional improvements include culvert extensions, new headwalls, and regraded fill slopes to accommodate future safety improvements. Special attention is required for the traffic control plan and work zone areas. Temporary traffic signals will be employed to meter the traffic one way at a time and reduce the speed through the work zone to a maximum of 10 MPH. The new culverts will be placed by constructing half the road at a time and shifting traffic as needed to complete the installation. Constructing both culvert crossings simultaneously will be allowed as long as appropriate maintenance of traffic measures are implemented by the Contractor. Vehicular access to all areas serviced by Don Bishop Road will need to be provided throughout the duration of the project. Contract duration is set for 6 months to construct both locations and an additional month to complete the final punch list and supply as-built surveys of each installation. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |