Similar Projects
Walton County Middle School Retaining Wall
Post-Bid
DeFuniak Springs, FL 32435

Eve Circle Roadway & Drainage Improvements
Post-Bid
De Funiak Springs, FL 32433

Drainage Repairs
Results
Less than $225,000 est. value

Drainage
Results
Less than $1,387,468 est. value
FL

Parking Lot Expansion Freeport Business Park
Post-Bid
FL

Western Lake Phase I Drainage Improvements
Results
De Funiak Springs, FL 32433

Mack Bayou Road Drainage Improvements
Results
De Funiak Springs, FL 32433

Drainage
Results
Less than $300,000 est. value

Grassing, Seeding, Sodding
Results
Less than $500,000 est. value

Drainage
Results
Less than $200,000 est. value

NRDA Artificial Reef Construction 2019-20 Deployment FWC Grant 19021
Results
FL

Drainage
Results
Less than $400,000 est. value

Grading
Results
Less than $500,000 est. value
FL

Pedestrian Crossing/Box Culvert/ADA Compliant Ramp/Cantilever Retaining Wall
Results
Less than $5,306,230 est. value
FL

Drainage Repair
Results
Less than $102,000 est. value

Reported 04/14/2021 11:33 PM
Project Title

Don Bishop Road Cross Drain Replacement

Physical Address View project details and contacts
City, State (County) FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed activities will consist of replacing corrugated metal culvert pipes and headwalls with a new aluminum box culvert and round relief pipes within the rights-of-way of Don Bishop Road in Walton County. Additional improvements include culvert extensions, new headwalls, and regraded fill slopes to accommodate future safety improvements. Special attention is required for the traffic control plan and work zone areas. Temporary traffic signals will be employed to meter the traffic one way at a time and reduce the speed through the work zone to a maximum of 10 MPH. The new culverts will be placed by constructing half the road at a time and shifting traffic as needed to complete the installation. Constructing both culvert crossings simultaneously will be allowed as long as appropriate maintenance of traffic measures are implemented by the Contractor. Vehicular access to all areas serviced by Don Bishop Road will need to be provided throughout the duration of the project. Contract duration is set for 6 months to construct both locations and an additional month to complete the final punch list and supply as-built surveys of each installation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents