Similar Projects
Meadowlands Basin Outlet Improvements
Infrastructure
Bidding
$6,500,000 est. value
Willoughby, OH

Jacking and Boring Services
Post-Bid

Park New Armor Stone Revetment
New Construction, Infrastructure
Post-Bid
Perry, OH 44081

Willoway Beach Shoreline Revetment
Term Contract
Results
$2,000,000 est. value
Eastlake, OH 44095

Reventment Bags and Erosion Control Mats
Results

Jacking and Boring Services
Infrastructure
Post-Bid

Culvert Invert Paving
Term Contract
Results

Box Culverts
Infrastructure
Post-Bid

North Perry Village Revetment Project
Results
$510,000 est. value
North Perry, OH 44081

Concrete Pipes
Infrastructure
Post-Bid

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Precast Catch Basins, Risers, and Grates
Infrastructure
Post-Bid

Concrete Pipes
Term Contract
Results

Box Culverts
Term Contract
Results

Chagrin River Access 2021
Results
Eastlake, OH

Reported 01/28/2022 12:00 AM
Project Title

Grand River/Bank Street Slope Stabilization Project

Physical Address View project details and contacts
City, State (County) Painesville, OH   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project requires installation of a new anchored steel sheet pile retaining wall along Bank Street in Painesville, Ohio. The new wall is approximately 325 feet in length as measured along Banks Street, and overlaps existing retaining walls located at each end of the project limits. The new sheet pile wall will include steel wales and approximately 37 soil anchors installed through the wales near the top of wall. A new drain will be installed near the interface of the existing bank with the new sheet pile behind the retaining wall. This drain will collect ground water and pass through the sheet pile wall and progress downslope to empty over the bank into the Grand River. The wall will be backfilled with free draining stone separated from existing soils by geotextile. Sheet pile will need to be driven through and into stiff clays with pile lengths of around 45 feet. The project will require vibration monitoring due to the proximity of residential buildings on the opposite side of Bank Street. There is limited work area available along Bank Street. Traffic control measures such as barricades and signs will be required to perform the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents