Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Waterline Replacement Woodland Road
Alteration
Results
Mahopac, NY 10541

Carmel Water District 2 - Water Main Lining Project Phase 2
Infrastructure
Results
Carmel, NY

Cross-County Sanitary/Kessman Landfill Site
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Patterson, NY 12563

Patterson Crossing Mixed-Use
New Construction, Infrastructure - 418,220 SF
Design
$50,000,000 CJ est. value
Kent Lakes, NY 10512

Sutton Place Office Addition
Addition, Infrastructure
Pending Verification
$500,000 CJ est. value
Brewster, NY 10509

Verizon / Southeast (Brewster)
New Construction, Infrastructure
Pending Verification
$300,000 CJ est. value
Brewster, NY 10509

Barrett Hill
New Construction, Infrastructure
Design
$60,000,000 CJ est. value
Brewster, NY 10509

Dain’s Lumber
New Construction, Infrastructure - 25,900 SF
Pending Verification
$5,000,000 CJ est. value
Cold Spring, NY 10516

Route 6 Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carmel, NY 10512

Replacement of Water Meter Endpoints
Infrastructure
Post-Bid
$300,000 CJ est. value
Cold Spring, NY 10516

Replacement of Water Meter Endpoints
Infrastructure
Post-Bid
$300,000 CJ est. value
Cold Spring, NY 10516

Drewville Road Bridge over the West Branch Croton River Bridge Replacement
Infrastructure
Results
$3,193,000 CJ est. value
Carmel, NY 10512

RFP Engineering - Design, Bridge Replacements: Ramp G of I-84 over I-84 and I-684
Demolition, New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Kent Lakes, NY 10512

Hazardous Material Abatement at Castle Rock Residence of Castle Rock Park
Term Contract, Infrastructure
Post-Bid
$179,000 CJ est. value
Philipstown, NY 10524

Last Updated 01/16/2023 11:33 PM
Project Title

The Proposed Village of Cold Spring Emergency Interconnection to The Catskill Aqueduct

Physical Address View project details and contacts
City, State (County) Philipstown, NY 10516   (Putnam County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $299,865 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of installing approximately 175 ft of ductile iron pipe located along Fishkill Road in the Village of Nelsonville (for Cold Spring). Other related work shall include the installation of a water meter, backflow prevention device, concrete pit, and fire hydrants all in accordance with the plans and specifications as directed by the Engineer and Village T.M. #38.14-1-17 Bonding Requirements - Bid Bond 5 % Questions are submitted online No

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents