Similar Projects
96-inch Main Relocation, Isolation Valves Installations, and New Parallel Main - 122004 - Great Lakes Water Authority
Infrastructure
Conception
$116,168,000 CJ est. value
North Lakeport, MI 48059

96-inch Main Relocation, Isolation Valves Installations, and New Parallel Main - 122004 - Great Lakes Water Authority
Infrastructure
Conception
$116,168,000 CJ est. value
North Lakeport, MI 48059

Cawood Honda
Addition, Infrastructure - 3,485 SF
Design
$920,040 CJ est. value
Port Huron, MI 48060

Grove Avenue Mixed-Use / Port Huron
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Port Huron, MI 48060

Hot Mix Asphalt Cold Milling and Resurfacing, Sidewalk Ramps and Pavement Markings on Holland Avenue
Infrastructure
Bidding
$621,000 CJ est. value
Port Huron, MI 48060

Hot Mix Asphalt Cold Milling and Resurfacing, Sidewalk Ramps and Pavement Markings on 7th Street
Infrastructure
Bidding
$255,000 CJ est. value
Port Huron, MI 48060

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Buckland Industries
Infrastructure
Post-Bid
$3,927,000 est. value
Port Huron, MI 48060

2022 Sanitary System Improvements Pump Station Rehabilitation
Infrastructure
Results
$853,051 CJ est. value
East China, MI 48054

2022 Sanitary System Improvements Pump Station Rehabilitation
Infrastructure
Results
$853,051 CJ est. value
East China, MI 48054

Desmond Landing
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Port Huron, MI 48060

Economic Development Alliance of St. Clair County New Office Building
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$4,000,000 CJ est. value
Port Huron, MI 48060

Parks and Recreation Master Plan - Fort Gratiot Township
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Fort Gratiot, MI 48059

Marine City Storage Cold Storage Phase 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Marine City, MI 48039

Septage Holding Tanks Replacement Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Smiths Creek, MI 48074

Last Updated 10/05/2023 09:08 AM
Project Title

2023 Sewer Rehabilitation Program

Physical Address View project details and contacts
City, State (County) Algonac, MI 48001   (Saint Clair County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000330441 The project consists of sanitary sewer cleaning & televising and Cured-in-Place-Pipe Lining and Joint Grouting in various sewer pipes throughout the city. Question Acceptance Deadline 09/29/2023 05:00 PM EDT Questions are submitted online No -- Any questions for the project shall be emailed to ezmich@hrcengr.com General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % Each bid proposal shall be submitted electronically on the proposal forms provided and shall be accompanied by a scanned copy of a certified check, cashier's check or bid bond, executed by the bidder and Surety Company, payable to the City of Algonac in the amount of Five Percent (5%) of the accompanying bid. Proposal Guarantee shall provide assurance that the bidder will, upon acceptance of the bid, execute the necessary Contract with the City of Algonac. No bid may be withdrawn after scheduled closing time for receiving bids for at least ninety (90) days. *The City of Algonac reserves the right to reject all bids and to waive irregularities in bidding. The project consists of Cured-in-Place-Pipe Lining and Joint Grouting in various sewer pipes throughout the city. Key Items: Cleaning and Internal Video Inspection (8 inch to 18 inch) 3,520 Lft Sewer Lining, CIPP, 8 inch 1,238 Lft Sewer Lining, CIPP, 10 inch 293 Lft Sewer Lining, CIPP, 15 inch 1,332 Lft Sewer Lining, CIPP, 18 inch 657 Lft

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents