Similar Projects
Replacement Heaters at the Water Treatment Plant
Bidding
Harbor Beach, MI 48441

Replacement Boilers - Chippewa Hills School District
Bidding
Remus, MI 49340

Storm Water Mechanical and Electrical Systems Replacement Project
Post-Bid
Harrison Township, MI 48045

Construction Work for an Energy Performance Contract for Electric/Plumbing/ Mechanical/Build/Appliances
Post-Bid
Saint Joseph, MI 49085

Boiler Replacement for Columbiaville Elementary
Results
Less than $173,250 est. value
Columbiaville, MI 48463

Boiler Controls Upgrade
Results
Dollar Bay, MI 499220350

Boiler Replacements
Bidding
Munising, MI

Mechanical Improvement Projects Services
Post-Bid
Grand Rapids, MI

East McNair Steam Trap Replacement
Results
Less than $185,849 est. value
Houghton, MI 49931

Pump Station Maintenance Program
Bidding
Southfield, MI

Boiler Pre-Pricing Package
Post-Bid
Walled Lake, MI

Replace Bldg. 570 Boiler "Mulligans"
Results
$25,000 to $100,000 est. value
Harrison Township, MI 48045

2021 Mechanical System Improvements
Bidding
Coopersville, MI

Stevenson High School Mechanical Upgrades
Post-Bid
Sterling Heights, MI

Installation of Boiler
Results
East Tawas, MI 497309506

Last Updated 12/16/2019 01:36 PM
Project Title

DNR Escanaba Field Office Boiler Replacement

Physical Address View project details and contacts
City, State (County) Gladstone, MI   (Delta County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $83,955
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace the existing 850 MBH input natural gas-fired boiler and B&G series 1510 base mounted heating water pump with two new 399 MBH input high efficient condensing type heating water boilers and two heating water distribution pumps. Work shall include boiler control lead-lag and sequencing with outdoor reset, new air separator, pre-charged expansion tank, and all associated heating water and gas piping. Remove the existing indirect domestic hot water heater, piping and circulation pump. The work shall also include cleaning the vehicle storage garage AHU cabinet, heating coil, and dampers; and installing new controls, damper seals, and actuators on the unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Special Exhaust Systems, Engine Exhaust Systems, Mechanical Engine Exhaust Systems, Heating Boilers, Humidity Control Equipment, Mechanical Dehumidification Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents