Last Updated | 05/01/2023 04:36 PM |
Project Title | FY 2023B Street and Alley Program |
Physical Address | View project details and contacts |
City, State (County) | Dover, DE 19904 (Kent County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $538,814 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | FY 2023B Street and Alley Program If you have questions concerning this Intent to Bid, they must be made in writing and emailed to me at doverwhse@dover.de.us. All questions must be submitted no later than March 1, 2023 The work includes, but is not limited to: Furnishing all labor, equipment and materials necessary install to install 5 inlet protections, remove and replace approximately 1,140 linear feet of Type II Suburban Curb, remove and replace approximately 30 linear feet of Type III Curb and Gutter, remove and replace approximately 1,150 square feet of 4" concrete flatwork, remove and replace 5 catch basin frame and head, remove and replace approximately 20 linear feet of 8.5" concrete valley gutter, installation of 50 square feet of detectable truncated domes and install 80 cubic yards of graded aggregate. Contractors will also prepare approximately 15,576 square yards of subgrade for resurfacing or paving, including any cleaning, sweeping, root mat removal, manhole and valve lid adjustment, roto-mill 31,152 square yard-inch of bituminous pavement. Contractors will overlay approximately 1,943 tons of type "C" hot mix. Contractors will patch 220 square yards of roadway using type "C" hot mix. Other items included in this project includes 3,944 linear feet of single white solid striping, 13 painted arrows, and 40 linear feet of stop bar. The project duration is one hundred twenty (120) calendar days. Proposed Locations A. Dover Little League Parking Lot - Adjust utilities if necessary - Mill two inches of asphalt, apply tack coat, and pave parking lot - Pavement Markings B. E. Loockerman Street - John Hunn Brown to E. Division Street - Install inlet protection - Remove and replace damaged curb, and sidewalk - Remove and replace catch basin frame and head - Remove and replace damaged concrete valley gutter - Install truncated domes - Adjust utilities if necessary - Mill two inches of asphalt, apply tack coat, and pave road - Pavement Markings C. Loockerman Court - E. Loockerman Street to End - Install inlet protection - Remove and replace damaged curb - Remove and replace catch basin frame and head - Adjust utilities if necessary - Mill two inches of asphalt, apply tack coat, and pave road - Pavement markings |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |