Similar Projects
HVAC Control System Upgrade for Arvada Library
Post-Bid
Arvada, CO 80002

Remington Building (49RMB) Cooling Tower Replacement
Post-Bid
Lakewood, CO 80215

SB267 Upgrade HVAC Systems Group Homes Wheat Ridge Regional Center Phases 1 & 2
Results
$750,000 est. value
Wheat Ridge, CO 80033

HVAC System for Academy C-7 Wing, Building 120
Results
Less than $133,000 est. value
Golden, CO 80401

HVAC Maintenance Services
Post-Bid
Arvada, Evergreen, Golden, Lakewood, Littleton, Wheat Ridge, CO

Replace Obsolete Control Lakes Library
Results
$225,000 est. value
Golden, CO 80401

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

Prequalify Mechanical Contractors - Campus Infrastructure, Cp6 Chiller
Results
Less than $1,372,000 est. value
Golden, CO

Mechanical and Electrical Upgrades at 3 Troop Offices
Post-Bid
Less than $62,000 est. value
Lakewood, CO

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace HVAC and Lighting Systems
Results
Less than $554,000 est. value
Lakewood, CO 80215

Heat Exchanger Tube Bundles
Post-Bid

Annual Chiller Maintenance
Term Contract
Results
Lakewood, CO 80232

Heat Exchanger
Post-Bid
Golden, CO

Reported 04/15/2020 12:00 AM
Project Title

Lake Arbor Golf Course HVAC

Physical Address View project details and contacts
City, State (County) Arvada, CO   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove and replace existing air handlers with gas fired furnaces and split DX cooling coils, and outdoor condensing units. 2. Relocate existing walk-in cooler condensing unit, extend refrigerant liquid and suction piping as necessary. 3. Remove and dispose of existing roof-mounted make-up air unit above kitchen. 4. Modify ductwork to accommodate connections from existing distribution ductwork in attic to new air handlers in mechanical room. 5. Provide and install airflow monitoring station for outside air ducts. 6. Route condensate drain piping from new high-efficiency condensing furnaces to existing floor drain. 7. Furnish and install new grade-mounted make up air unit with evaporative cooling and direct fired gas heating. Provide and install approximately 10 feet of outdoor rated ductwork with paintable shrouding until through-wall penetration. 8. Provide new building automation system (Delta Controls) to control and monitor all equipment. 9. New concrete pad 10. Partial demo of existing CMU wall 11. New fence 12. Roof patching

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents