Similar Projects
Last Updated | 05/13/2021 01:35 PM |
Project Title | Cured in Place and Spray on Drainage Structure Liners, Upon Request in Division 2 |
Physical Address | View project details and contacts |
City, State (County) | (Beaufort, Carteret, Craven, Greene, Jones, Lenoir, Pamlico, Pitt Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 Sp Vacuum Truck 40 Hr 2 Sp Invert Placement 60 Lf 3 Sp De-Watering 2" Pump 10 Ea 4 Sp De-Watering 4" Pump 5 Ea 5 Sp De-Watering 6" Pump 5 Ea 6 Sp Point Repair 15 Ea 7 Sp Host Pipe Grouting (Less Than 1 Cyd) 250 Gal 8 Sp 15" Pipe Rehabilitation Cipp 100 Lf 9 Sp 18" Pipe Rehabilitation Cipp 300 Lf 10 Sp 24" Pipe Rehabilitation Cipp 300 Lf 11 Sp 30" Pipe Rehabilitation Cipp 120 Lf 12 Sp 36" Pipe Rehabilitation Cipp 300 Lf 13 Sp 42” Pipe Rehabilitation Cipp 300 Lf 14 Sp 48” Pipe Rehabilitation Cipp 300 Lf 15 Sp 30" Pipe Rehabilitation Spray Liner 100 Lf 16 Sp 36" Pipe Rehabilitation Spray Liner 100 Lf 17 Sp 42" Pipe Rehabilitation Spray Liner 60 Lf 18 Sp 48" Pipe Rehabilitation Spray Liner 60 Lf 19 Sp 54" Pipe Rehabilitation Spray Liner 100 Lf 20 Sp 60" Pipe Rehabilitation Spray Liner 300 Lf 21 Sp 66" Pipe Rehabilitation Spray Liner 60 Lf 22 Sp 72" Pipe Rehabilitation Spray Liner 60 Lf 23 Sp 84" Pipe Rehabilitation Spray Liner 60 Lf 24 Sp 96" Pipe Rehabilitation Spray Liner 300 Lf 25 Sp Pipe Extension 15" 24 Lf 26 Sp Pipe Extension 18" 24 Lf 27 Sp Pipe Extension 24" 24 Lf 28 Sp Pipe Extension 30" 24 Lf 29 Sp Pipe Extension 36" 24 Lf 30 Sp Pipe Extension 42" 24 Lf 31 Sp Pipe Extension 48" 24 Lf 32 Sp Pipe Extension 54" 24 Lf 33 Sp Pipe Extension 60" 24 Lf 34 Sp Pipe Extension 66" 24 Lf 35 Sp Pipe Extension 72" 24 Lf 36 Sp Pipe Extension 84" 24 Lf 37 Sp Pipe Extension 96" 24 Lf 38 Sp Lane Closure (Two Lane-Two Way) 10 Ea 39 Sp Lane Closure (Multi-Lane Undivd) 3 Ea 40 Sp Lane Closure (Multi-Lane Divided) 3 Ea 41 Sp Host Pipe Grouting (More Than 1 Cyd) 10 Cyd 42 Sp Cctv Existing Drainage Inspection 40 Hr |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |