Similar Projects
Oregon Coast Aquarium Renovation Phase 2
New Construction, Renovation, Infrastructure - 10,650 SF
Design
$18,000,000 CJ est. value
Newport, OR 97365

New Rehabilitation Facility / The Oregon Coast Aquarium
New Construction, Infrastructure
Design
$9,750,000 CJ est. value
Newport, OR 97365

Siding and Window Replacement - Phase 1
Renovation
Bidding
$85,000 CJ est. value
Eddyville, OR 97343

Schooner Landing Sewer Bypass Project
Infrastructure
Bidding
$500,000 CJ est. value
Newport, OR 97365

Schoolhouse Street Improvements
Infrastructure
Post-Bid
Depoe Bay, OR 97341

L9 Pole Replacement Project
Infrastructure
Post-Bid
$622,000 CJ est. value
Newport, OR 97365

Southwest 63Rd And Southwest Inlet Avenue Overlay
Alteration
Results
$375,000 est. value
Lincoln City, OR 97367

2022 East 2nd Street Improvements
Infrastructure
Results
$320,000 est. value
Yachats, OR 97498

Yaquina View Elementary New Gymnasium
New Construction
Construction
Newport, OR 97365

US 101: Culverts (MP 73.46 - 136.29)
Infrastructure
Design
$4,365,000 CJ est. value
Yachats, OR 97498

Yhona Overlook and Cobble Beach Stairs
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Newport, OR 97365

US 101 Frontage Road: Ben Jones (Rocky Creek) Bridge
Infrastructure
Design
$6,172,000 CJ est. value
Newport, OR 97365

RFP Engineering - Construction and Engineering Services for Underground Construction - PacWave South
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Newport, OR 97365

RFP D/B - Hatfield Marine Science Center Student Housing
New Construction, Infrastructure
Post-Bid
$13,000,000 CJ est. value
Newport, OR 97365

Water System Improvements
Renovation, Infrastructure
Post-Bid
$270,000 CJ est. value
Tidewater, OR 97390

Last Updated 01/11/2023 10:05 AM
Project Title

RFP D/B - Community Park in Taft District Improvements

Physical Address View project details and contacts
City, State (County) Lincoln City, OR 97367   (Lincoln County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Maintenance, Park/Playground, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

“The owner has selected a Design Builder. A timeline for construction has not yet been established.” Pre-submittal Meeting - There Will Not Be a Pre-submittal Meeting or Site Visit Conducted by the City. Proposers Are Required to Conduct a Field Review of the Project Area on Their Own to Acquaint Themselves With Pertinent Conditions Prior to Preparing and Submitting Their Proposal. Questions - All Questions or Requests for Clarification Shall Be Directed in Writing to the Terry Chamberlin, Project Engineer, via Email: Tchamberlin@lincolncity.org, or by Regular Mail to Lincoln City, Po Box 50, Lincoln City, Oregon 97367. All Written Questions Must Be Received by the Project Engineer by 5 Pm Pst on December 12, 2021, 10 Calendar Days Prior to the Bid Due Date. The Project Engineer Will Determine Appropriate Responses, if Any, and if Necessary an Addendum Will Be Issued to All Plan Holders of Record at Least 5 Calendar Days Prior to the Bid Due Date. Any Verbal Response(S) Obtained From Any Source by Bidders Will Be Considered Informational and Shall Not Be Relied Upon by Bidders. The Contractor Must Comply With the Provisions Required by Ors 279c.800 to Ors 279c.870 (Prevailing Wage Rate). City May Cancel This Procurement or Reject Any Bid That Does Not Comply With All Prescribed Public Bidding Procedures and Requirements, Including the Requirement to Demonstrate the Bidder's Responsibility Under Ors 279c.375 (3)(B) and That City May Reject for Good Cause All Bids After Finding That Doing So is in the Public Interest. The City current budget is $2,235,000 during this fiscal year which an estimated total budget of over $5 million dollars that will be constructed in separate Construction Tasks as the money is budgeted.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents