Similar Projects
Public Works Building Expansion Phase 2
Addition
Conception
Cedar Park, TX 78613

Jarrell High School Expansion
Addition - 57,350 SF
Conception
Jarrell, TX 76537

Y- Design-Build (DB) Indefinite-Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC)
Design
$4,000,000 to $249,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Bidding
$500,000 to $20,000,000 est. value

Design-Build Firm for DPS Statewide Deferred Maintenance
Renovation
Post-Bid
Less than $16,985,665 est. value

CMAR CD Fulkes Middle School Rebuild
Renovation
Post-Bid
Less than $50,000,000 est. value
Round Rock, TX

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

City Center
New Construction
Pending Verification
$5,400,000 est. value
Georgetown, TX

Regional Animal Shelter
Renovation
Pending Verification
Cedar Park, TX

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Multiple Award Task Order Contract (MATOC) ($180M) for Construction Phase Services (CPS) for the US. Army Corps of Engineers, South Pacific and Southwestern Divisions in support of the Border Infrastructure Program
New Construction
Results
Less than $180,000,000 est. value

New Five-Story Administration Building
New Construction
Pending Verification
$43,000,000 est. value
TX

Reported 11/16/2021 04:48 PM
Project Title

New Building for 18+ Services

Physical Address View project details and contacts
City, State (County) Leander, TX   (Williamson County)
Category(s) Education, Government/Public
Sub-Category(s) Middle/Senior High School, Misc. Buildings
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value $16,337,783
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Misc. Buildings, New Construction, Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents