Similar Projects
Clovis Barker Road and Civic Center Loop
Infrastructure
Bidding
San Marcos, TX 78666

Sessom Drainage and Street Improvements
Infrastructure
Bidding
$6,531,373 est. value
San Marcos, TX 78666

Plum Creek Marketplace Avenue Phase 2 - Water, Wastewater, Drainage, and Paving Facilities
Post-Bid
TX

Road Improvements: Hot Mix Overlay
Post-Bid
San Marcos, TX 78666

Southern Region Disaster Recovery Support BPA
Results

Freeway Operational Improvements
Results
Less than $13,478,457 est. value
TX

Driftwood Club Core Phases 1 and 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

Crack Seal of Asphalt Pavement
Results
Less than $241,524 est. value
TX

Driftwood Phase 1 Section 2 Paving, Drainage, Water, Wastewater, and Rainwater Collection System Improvements
Post-Bid
Driftwood, TX 78619

E Hopkins Pedestrian & Bike Improvements (Hopkins from CM Allen to Thorpe)
Results
Less than $1,750,000 est. value
San Marcos, TX 78666

Old Fitzhugh Road Project
Post-Bid
$4,400,000 to $4,800,000 est. value
Dripping Springs, TX 78620

Road Improvements Remove and Replace Hot Mix
Results
Less than $1,761,155 est. value
San Marcos, TX 78666

SH 130 - Cherryville Parkway / CR 110 Improvements
Post-Bid
$700,000 est. value
Buda, TX

Sunfield Phase 4 Section 3A Paving Improvements
Results
Buda, TX 78610

Kissing Tree West Centerpoint Road - Phase 2B
Infrastructure
Post-Bid
San Marcos, TX 78666

Reported 12/01/2021 12:00 AM
Project Title

Cotton Gin Road - Low Water Crossing

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed project will improve the existing low water crossing at Cotton Gin Road over Porter Creek, replacing the existing two 36-inch diameter corrugated metal pipe with five 10-foot x 5-foot boxes. The project includes new safety guard rails and streambank stabilization. The project includes new safety guard rails and streambank stabilization. The existing roadway width of approximately 24-feet will be widened to a minimum of 25-feet and will improve approximately 310 feet of roadway. The project also includes approximately 200 linear feet of guard rail installation along the pavement edge for traffic protection. Drainage improvements include new culvert and slope protection. Upon completion of the project all disturbed areas shall be revegetated. The improvements will significantly reduce overtopping of the road and lower the flooding elevation upstream of the crossing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents