Reported | 04/01/2020 12:00 AM |
Project Title | Propel Montour Elementary - Asphalt Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Pittsburgh, PA 15205 (Allegheny County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Prepare old asphalt to receive a new topcoat at Propel Montour Elementary School. The first lot is in the rear of the building, approximately 12,900 square feet. The second lot is across the street in the rear of the school, and is approximately 10,075 square feet. The driveway is also across the street in the rear of the school, and is approximately 2,112 square feet. Contractor must field measure and provide exact square footage. Specifications include all labor, supervision, equipment, tools, materials, transportation, and means of construction necessary to perform the excavation, rough grading, finish grading, and installing the bituminous paving. Work may start on June 22, 2020. Procurement of materials and supplies may/should begin before access to the school parking lot(s) is available to ensure timely completion of the project. All goods and furnished items must be procured in a timely manner to allow for a completion date of July 31, 2020. The successful contractor shall provide and/or complete the following: 1. Preparation work includes grinding of existing black top for proper drainage. 2. Clean the entire lot(s) and driveway in preparation for resurfacing. 3. Adjust all manhole rims and drainage covers to allow for positive drainage. 4. Apply binder to allow for proper adhesion. 5. Install wear course of 1.5 inches of bituminous surface course. 6. Roll wearing course. 7. Tar all edges where new black top meets asphalt and/or concrete. 8. Work needs to be completed by July 31, 2020. 9. All playground markings will need to be re-painted |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |