Similar Projects
Cumberland Mills Triangle Mill and Fill
Infrastructure
Bidding
Westbrook, ME

Highway Safety Improvements/Located On Route 25 Along William Clarke Drive Beginning 0.09 Mile Westerly of Conant Street, Extending 0.06 Mile East.
Infrastructure
Bidding
ME

Road Resurfacing, Reclamation, and Other Road Repair Services
Post-Bid
Portland, ME

Windham Middle School SRRF Exterior ADA Access Upgrade
Post-Bid
Windham, ME 04062

Highway Safety Improvements
Results
Westbrook, ME

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,258,000 est. value
South Portland, ME 04101

Crack Sealing Services
Term Contract, Infrastructure
Post-Bid
Portland, ME

Route 35 Sidewalk Improvements
Results
Windham, ME 04062

Repair Pavement Main Entrance South Portland Air National Guard Station (SPANGS)
Infrastructure
Post-Bid
$47,000 est. value
South Portland, ME 04106

Cedar Street Parking Facility
Results
Brunswick, ME 04011

Highland Beach Sidewalk Project
Infrastructure
Post-Bid
Bridgton, ME 04009

Andrews Square Intersection Improvements
Results
$400,000 est. value
Portland, ME

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Road Resurfacing, Reclamation and Other Road Repair Services
Term Contract
Results
New Gloucester, ME 04260

Park and Ride Shim and Overlay
Results
Portland, ME 04019

Last Updated 01/13/2022 09:42 AM
Project Title

Main Street Rehabilitation and Sidewalk Project

Physical Address View project details and contacts
City, State (County) Raymond, ME 04071   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: Reclamation of existing travel-way and placement of new HMA pavement structure. Instillation of HMA sidewalk along main street. ADA upgrades at route 302/ route 121 intersection. Additional work includes, but is not limited to, earthwork, pavement marking removal and installation, pedestrian signal upgrades, pedestrian and vehicular traffic control and all associated work. The Project is located along Main Street in Raymond, Maine. The work areas are approximately from the intersection of Route 302/ Route 121 to approximately the Raymond Parks and Recreation property. Outline of Work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents