Similar Projects
U-Haul
Renovation - 119,791 SF
Conception
$10,000,000 est. value
Lansing, MI 48911

Amazon Logistics Distribution Center - Unit 5 (Last Mile Delivery Center)
Renovation - 87,000 SF
Conception
South Lyon, MI 48393

Beyond Self Storage
New Construction, Demolition
Design
Farmington Hills, MI 48334

Pinnacle Race Course
New Construction - 1,200,000 SF
Design
$10,000,000 CJ est. value
Huron Township, MI

New Outdoor Pavilion at the Marion D. Crouse Instructional Facility
Bidding
Flint, MI 48532

Former Midwest Tire-Site Remediation
Renovation
Bidding
Flint, MI 48505

Cold Storage Barn
Post-Bid
Elsie, MI 48831

Storage and Maintenance Building Thomas M. Ryan Intermediate School
Build-Out
Post-Bid
Richland, MI

DPW Storage Building Project
Results
Less than $564,138 est. value
Saint Clair Shores, MI

New Vehicle Maintenance Facility – Building Fit Out
Results
Mount Clemens, MI

National Storage Centers - Building D
New Construction - 17,217 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Comstock Park, MI 49321

UTSI Finance – Design Build PEMB Super Center
New Construction - 54,000 SF
Construction
$13,000,000 est. value
Dearborn, MI 48126

Octapharma Plasma - Expansion
New Construction - 805 SF
Pending Verification
Less than $500,000 CJ est. value
Ypsilanti, MI 48197

Oakleaf Village of Garfield Township - Senior Living Campus
New Construction - 156,800 SF
Pending Verification
$10,000,000 CJ est. value
Traverse City, MI 49685

Redwood Living - Portage - Rental Home Community
New Construction
Conception
Portage, MI 49002

Reported 01/29/2020 12:00 AM
Project Title

Duck Park Kayak Storage Building

Physical Address View project details and contacts
City, State (County) Alpena, MI   (Alpena County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes, but is not limited to, all permits, labor, equipment and materials to construct the proposed 12’ by 24’ CMU storage building

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents