Similar Projects
Phase II Drainage Project at St James Farm
Infrastructure
Bidding
$300,000 est. value
Winfield, IL 60190

Hawthorne Hill Woods, Phase 1 - Culvert Replacements Project
Infrastructure
Bidding
$200,000 est. value
Woodridge, IL 60517

Retaining Wall
Term Contract
Post-Bid
Darien, IL

2021 Clow Creek Shoreline Restoration
Post-Bid
Naperville, IL

RR-20-4554 Box Culvert Construction Tri-State Tollway I-294 Ogden Avenue to Cermak Road
Results
Downers Grove, IL

Willowbrook HS Double Culvert Replacement
Results
Villa Park, IL 60181

Wisconsin Avenue Drainage Improvements
Infrastructure
Bidding
$3,000,000 est. value
Downers Grove, IL 60515

Everglade Avenue Drainage Improvements
Post-Bid
Woodridge, IL

Fullerton Park Culvert Lining
Results
Wheaton, IL

Truck Shed Demolition and Drainage Improvements
Infrastructure
Post-Bid
Wheaton, IL

Fox River West Dam And Canoe Chute Repair
Results
Aurora, IL

Various Galvanized Culvert Metal Pipe Materials
Infrastructure
Post-Bid
Darien, IL

Highland Avenue and 41st Street Drainage Improvements
Results
Downers Grove, IL

Culvert Metal Pipe
Infrastructure
Post-Bid
Darien, IL

RR-21-4580_I-88 Reagan Mem Tlwy_M-8 Maint.FacilEastbnd Access
Term Contract
Results
Downers Grove, IL

Last Updated 07/06/2022 01:06 AM
Project Title

South-Central Interceptor Stabilization Project - Stage 2

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be accessed from Gartner Road and 75th Street, with temporary haul roads on easements across residential and commercial property. Erosion of the shoreline is threatening the integrity of this sewer; the segment being approximately 2,300 FT in length.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents