Similar Projects
Dowagiac City Hall- Water Infiltration Project
Infrastructure
Bidding
$300,000 CJ est. value
Dowagiac, MI 49047

Dowagiac City Hall- Water Infiltration Project
Infrastructure
Bidding
$300,000 CJ est. value
Dowagiac, MI 49047

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Hot Mix Asphalt Paving
Infrastructure
Post-Bid
Cassopolis, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

GSB-88
Infrastructure
Results
Cassopolis, MI

Hydro Aluminium Recycling Plant
New Construction, Infrastructure
Pending Verification
$140,000,000 CJ est. value
Cassopolis, MI 49031

Lakeview Ave Boathouse Addition
Addition, Infrastructure - 1,488 SF
Pending Verification
$400,000 CJ est. value
Dowagiac, MI 49047

Cold Milling Hma Surface
Alteration
Post-Bid
Cassopolis, MI

0.25 MI of Hot Mix Asphalt Reconstruction, Concrete Curb, Gutter and Ramps, Sanitary and Storm Sewer and Pavement Markings on O'Keefe Street from York Street to Graham Street
Infrastructure
Results
MI

Road Repair - Concrete Curb and Gutter
Infrastructure
Post-Bid
MI

Single Chip Seal, Fog Seal, Overband Crack Seal and Pavement Markings on M-51
Infrastructure
Results
$1,449,000 est. value
Dowagiac, MI 49047

Pennsylvania Avenue Parking Lot and Streetscape and Beeson Sewer Extension Project
Infrastructure
Post-Bid
$2,000,000 est. value
Dowagiac, MI 49047

Southwest Region - Lean-To's
Renovation, Infrastructure
Results
$2,936,210 CJ est. value
Niles, MI 49120

2022 Hot-Mix Asphalt Patching
Infrastructure
Post-Bid
$300,000 est. value
Dowagiac, MI

Last Updated 05/12/2023 08:31 AM
Project Title

Parking Lot Storm Water Drainage

Physical Address View project details and contacts
City, State (County) Cassopolis, MI 49031   (Cass County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 12 2023, no bids received. Questions may be directed to Brian Smith, Director of Facilities at 269-445-0624 or via email at brianleesmith@cassopolis.org The work shall consist of disconnecting existing parking lot storm water drainage lines from the football/track drainage line at catch basin 15a (see drawing) and installing a new drainage line (minimum 12" diameter solid pipe) from that point, east ofthe stadium bleachers, and south to the farm field (see drawing). Contractor must provide all labor, materials, and equipment necessary to complete this project. All equipment must meet OSHA and MIOSHA standards.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents