Similar Projects
Design/Build Services for Route 146 Reconstruction
Bidding
Providence, RI 02912

Upper College Road Reconstruction Phase 1
Bidding
Kingston, RI

I-95 Resurfacing 2B - Charles Street to Lonsdale Avenue
Post-Bid
Pawtucket, RI

B148 Driveway Repaving.
Post-Bid
$25,000 to $100,000 est. value
Newport, RI

Z--Project # 650-07-102: Pavement Repairs
Results
$2,000,000 to $5,000,000 est. value
Providence, RI 02908

Road Paving
Results
Less than $592,173 est. value
Jamestown, RI

2021 Paver Placed Elastomeric Surface Treatment C-1
Bidding

Paving Indefinite Delivery Indefinite Quantity PWD Newport, Rhode Island
Post-Bid
$10,000,000 to $25,000,000 est. value
Newport, RI 02841

State Traffic Commission Miscellaneous Improvements 2019
Results
Less than $1,678,500 est. value
Providence, RI 02903

Paving Project 2020-2021
Term Contract
Post-Bid
Foster, RI 02825

Pell Bridge Ramps - Phase I - Improvements to JT Connell and Coddington Highway
Results
Providence, RI 02903

2021 Roadway Improvements
Post-Bid
New Shoreham, RI

Green and Complete Streets
Results
Central Falls, RI

Miscellaneous Road Construction - 2021
Post-Bid
Narragansett, RI

East Bay Bike Path Improvements
Results
Warren, RI

Reported 04/02/2020 12:00 AM
Project Title

Asphalt Pavement Improvements

Physical Address View project details and contacts
City, State (County) Coventry, RI   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes asphalt milling, leveling and paving of named streets, full depth repair of potholes, removing and replacing asphalt curbs, adjustment of catch basins, manholes, gas and water valve covers, pavement markings and necessary traffic control. All work must be completed within 90 days of notice to proceed. It is anticipated that roads included in the Asphalt Pavement Improvements will be paved during the Spring/Summer of 2020.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents