Similar Projects
Professional Offices and Warehouse
Renovation
Conception
Merrimack, NH 03054

Pitco Frialator Manufacturing Facility, Warehouse, and Offices
New Construction - 356,224 SF
Conception
Concord, NH 03301

Pella Windows and Doors of New England Office and Distribution Center
New Construction - 24,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Rochester, NH

Five Aviation Park Drive Industrial
New Construction - 90,521 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Londonderry, NH

Erecting A Weathertight Building
Renovation
Bidding
Pittsburg, NH 03592

SAU Renovation Project
Renovation
Bidding
Contoocook, Hopkinton, NH 03229

Dartmouth College Library Storage and Records Management Facility
New Construction
Sub-Bidding
Hanover, NH 03755

Salt Shed Storage Building
Post-Bid
New Ipswich, NH

Portsmouth Christian Academy Drainage & Site Improvements
Renovation
Post-Bid
Dover, NH 03820

Salt/Sand Shed
Results
Groveton, NH 03582

Storage Warehouse Structure
Results
Manchester, NH 03109

Club Motorsports Park - Phase II
New Construction - 11,880 SF
Construction
$8,000,000 to $10,000,000 est. value
Tamworth, NH 03886

Flatley Mixed Use
New Construction - 100,000 SF
Construction
$1,000,000 to $2,000,000 est. value
Merrimack, NH 03054

Amherst School Building Construction
New Construction, Renovation, Addition
Pending Verification
$35,000,000 est. value
Amherst, NH

Souhegan High School Building Construction
New Construction, Renovation
Pending Verification
$5,000,000 est. value
Amherst, NH

Last Updated 03/14/2022 12:48 PM
Project Title

Spaulding High School Field Storage Building

Physical Address View project details and contacts
City, State (County) Rochester, NH 03867   (Strafford County)
Category(s) Commercial, Education
Sub-Category(s) Middle/Senior High School, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete construction of a new field storage building at the Spaulding High School, 130 Wakefield Street, Rochester NH 03867. This specification covers the fabrication, furnishing, delivery, and installation of a complete 40’ x 60’ storage building.

Details

Middle/Senior High School, New Construction, Warehouse/Storage, 2,400 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents