Similar Projects
Last Updated | 09/18/2023 09:14 AM |
Project Title | E. New Orleans St. Widening From S. 209th E. Ave. To S. 215th E. Ave. |
Physical Address | View project details and contacts |
City, State (County) | Broken Arrow, OK 74011 (Tulsa County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,270,688 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site Directions: ST21380 E. NEW ORLEANS ST. WIDENING FROM S. 209TH E. AVE. TO S. 215TH E. AVE.: This project is located along E. New Orleans St. from the S. 209th E. Ave intersection to S. 215th E. Ave This project includes widening of E. New Orleans St. from the S. 209th E. Ave. intersection to S. 215th E. Ave. from two-lanes to three/four-lanes with curb and gutter. The pavement widening includes approximately 1,900 linear feet of three-lane section, one through lane each direction along with a dedicated two-way left-turn lane, and approximately 500 linear feet of dedicated right-turn lane. The project also includes construction of approximately: 815 square yards of 5' wide concrete sidewalk and 10' wide concrete trail; approximately 2743 feet of curb and gutter; pedestrian signal crossing improvements; driveways; extension of existing 10'x6' RCB; and approximately 1,000 feet of enclosed storm sewer. Contract time for the project shall be One Hundred Fifty (150) calendar days. Required Project Milestones: September 19th, 2022 Commence construction (contractor shall begin work September 19th, 2022 and may not begin earlier) Sworn statement of the Bidders assets and liabilities, technical qualifications and performance in the form of the latest annual report and financial statement are not required to be submitted with the Bidders Proposal, but City of Broken Arrow may require such statements prior to award of the construction contract. Both the Statement of Qualifications & Experience and the Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in the City of Broken Arrow considering the Bid non-responsive and result in rejection of the Bid by the City of Broken Arrow. Bidders may be required to provide supplemental information if requested by the City of Broken Arrow to clarify, enhance or supplement the information provided in the Statement of Qualifications & Experience and/or the Statement of Key Personnel Qualifications & Experience. The apparent successful Bidder shall, within two (2) days after Bid opening, submit to City of Broken Arrow a list of the Subcontractors, Suppliers, individuals or entities proposed for the following portions of the Work: asphalt, concrete, and stormwater work. Such list shall be accompanied by a Statement of Qualifications & Experience as well as a Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If City of Broken Arrow or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, City of Broken Arrow may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. If apparent Successful Bidder declines to make any such substitution, City of Broken Arrow may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by the City of Broken Arrow, submit to City of Broken Arrow the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, City of Broken Arrow will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within five (5) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price. The bid opening will be live-streamed and recorded. The acceptance and award of this Bid will be considered by the Broken Arrow City Council. The City of Broken Arrow reserves the right to reject any or all Bids. Project will be awarded to the responsible Bidder with the lowest base bid or lowest combined base and additive alternate bids, if any, which is most advantageous to the City of Broken Arrow. Applicable additive alternates, if any, will be determined at the City of Broken Arrows discretion. The lowest responsible Bidder will be notified within five (5) working days of the Bid opening as to when this Public Construction Contract will be placed on the Broken Arrow City Council Agenda for consideration. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |