Last Updated 05/25/2021 08:20 AM
Project Title

CPS Steinmetz HS Rear Parking Lot Repair

Physical Address View project details and contacts
City, State (County) Chicago, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide Labor and Materials to: 1)Replace asphalt on the rear staff parking lot and add concrete for the recycle dumpster area near door 9. 2)Work will start from recycle dumpster near door 9, all of the area going towards door 8, and the staff lot. 3)Concrete a)Excavate area by door 9 that holds the recycle dumpster. b)Pour new 8” thick heavy duty concrete in area according to drawing and specifications provided. c)See concrete drawing below. d)Approx. 300 sq. ft. e)Contractor to remove existing old asphalt and haul away.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents