Last Updated 03/01/2019 08:55 AM
Project Title

2019 Resurfacing Project

Physical Address View project details and contacts
City, State (County) Brookhaven, GA   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The work locations and descriptions follow but are not limited to: 1. Briarwood Way from Briarwood Rd to Drew Valley Rd (4821 SY): Mill existing asphalt pavement at 3 inches depth for full contracted width and length, Overlay with OGI at 95/lbs/sy, 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 84 square yards. 2. Executive Park North from Executive Park Drive to City Limits (1941 SY): Mill existing asphalt pavement at 2.5 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 63 square yards. 3. Flowerland Drive from Hartford Glen to Harts Mill Rd (300 SY): Mill existing asphalt pavement at 2 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 125 lbs/sy. 4. Hartford Glen from West end to East End (1650 SY): Mill existing asphalt pavement at 2 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. 5. Tall Tree Drive from Roxboro Drive to East Roxboro Rd (3091 SY): Mill existing asphalt pavement at 3.5 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy, OGI at 95 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 121 square yards. 6. Tugaloo Drive from Coosawattee Dr to East end (1817 SY): Mill existing asphalt pavement at 3.5 inches depth for full contracted width and length, Overlay with 19 mm at 220 lbs/sy, OGI at 95 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 172 square yards. 7. Winchester Trail from Remington Rd to Chamblee Dunwoody Rd (3385 SY): Mill existing asphalt pavement at 3 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 5.5 inches depth for 371 square yards.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.