Last Updated | 03/01/2019 08:55 AM |
Project Title | 2019 Resurfacing Project |
Physical Address | View project details and contacts |
City, State (County) | Brookhaven, GA (DeKalb County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,400,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work locations and descriptions follow but are not limited to: 1. Briarwood Way from Briarwood Rd to Drew Valley Rd (4821 SY): Mill existing asphalt pavement at 3 inches depth for full contracted width and length, Overlay with OGI at 95/lbs/sy, 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 84 square yards. 2. Executive Park North from Executive Park Drive to City Limits (1941 SY): Mill existing asphalt pavement at 2.5 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 63 square yards. 3. Flowerland Drive from Hartford Glen to Harts Mill Rd (300 SY): Mill existing asphalt pavement at 2 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 125 lbs/sy. 4. Hartford Glen from West end to East End (1650 SY): Mill existing asphalt pavement at 2 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. 5. Tall Tree Drive from Roxboro Drive to East Roxboro Rd (3091 SY): Mill existing asphalt pavement at 3.5 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy, OGI at 95 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 121 square yards. 6. Tugaloo Drive from Coosawattee Dr to East end (1817 SY): Mill existing asphalt pavement at 3.5 inches depth for full contracted width and length, Overlay with 19 mm at 220 lbs/sy, OGI at 95 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 6 inch depth for 172 square yards. 7. Winchester Trail from Remington Rd to Chamblee Dunwoody Rd (3385 SY): Mill existing asphalt pavement at 3 inches depth for full contracted width and length, Overlay with 19mm at 220 lbs/sy and 9.5 mm Superpave at 110 lbs/sy. Patching at 5.5 inches depth for 371 square yards. | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |