Similar Projects
Roll Off Dumpsters for Rags and Grit Hauling
Term Contract
Post-Bid
Salt Lake City, UT 84111

Signage for Wakara Buildings 417, 419, 423
Term Contract
Post-Bid
Salt Lake City, UT 84108

Sewer Pump Station 1
Results
Less than $12,000,000 est. value
Salt Lake City, UT

Construction of the Booster Pump Station
Results
Less than $55,000 est. value
Herriman, UT 84096

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

SLC Airport Pumphouse Station #1
Results
Salt Lake City, UT 84122

Sources Sought Announcement No. W9128f20x0bfq Indefinite Delivery Contracts for Architect-Engineer Services, Northwestern Division, USACE
Post-Bid
$3,000 to $3,500,000 est. value

500 West Lift Station Rehabilitation
Results
$274,000 est. value
Salt Lake City, UT 84115

Janitorial Service for Chase Home
Term Contract
Post-Bid
Less than $41,000 est. value
Salt Lake City, UT 84105

900 North Lift Station Rehabilitation
Results
Less than $1,257,000 est. value
Salt Lake City, UT 84115

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

Facilities Wash Bay
Results
Sandy, UT

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Airport Pump Station Pump 5 and Motor Installation
Results
West Jordan, UT 84088

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

Last Updated 04/20/2020 07:11 PM
Project Title

Golden Hills Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Cottonwood Heights, UT 84121   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $276,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: The project consists of partial demolition of the existing vault deck; removal of the existing vault entrance, stairway, piping and appurtenances, pumps, pressure tank, and pump station bypass vault; protecting and salvaging the rock wall; construction of a new covered entrance and new sump; installation of a new stairway, piping and appurtenances, pumps, pressure tanks, heater, ventilation fan, louvers, duct work, generator pad, generator, equipment access hatch, retaining wall, concrete stairs and walkway, and telemetry equipment, including an RTU panel, antenna, flood switches, intrusion switches, generator status, ATS position, and pressure transmitters; relocation of existing electrical facilities and water meters; coring through the concrete vault for installation of the intake louver and piping; and site restoration including all site grading, decorative gravel, rock walls, rock stairway, and seeding.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents