Similar Projects
Mixed Use Development
New Construction, Demolition
Conception
Hope Mills, NC

Home Energy Improvement Project NC Weatherization Assistance Program
Renovation
Bidding

Target Area Repair Program Project
Renovation
Post-Bid
Fayetteville, NC

Emergency Housing Repair Project
Renovation
Post-Bid
Fayetteville, NC

Mobile Home Unit Replacement Services
Results
Fayetteville, NC 28301

3 Rehabilitation Housing Repairs
Results
Less than $29,999 est. value
Fayetteville, NC

Oakridge Estates - Phase I
New Construction - 60,000 SF
Construction
Fayetteville, NC 28301

Oakridge Estate Phase II
New Construction
Construction
Fayetteville, NC 28301

Rehabilitation Housing Repair Projects
Post-Bid
Less than $29,999 est. value
Fayetteville, NC 28304

Two (2) Emergency Housing Repair
Results
Fayetteville, NC 283015537

Home Energy Improvement Project - North Carolina Weatherization Assistance Program
Renovation
Post-Bid

Modular Homes
Results
Fayetteville, NC

Three (3) Emergency Housing Repair Projects
Post-Bid
Fayetteville, NC

Housing Rehabilitation Project - 687 Marble Court
Results
Fayetteville, NC 28311

Housing Rehabilitation Project - 6552 Lagood Drive
Results
Fayetteville, NC 28314

Reported 07/08/2020 10:36 AM
Project Title

Two Rehabilitation Projects

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28304   (Cumberland County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project Locations: 2109 Coinjock Circle, Fayetteville N.C 28304. 408 South Plymouth Street, Fayetteville N.C. 28312.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents