Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Rehabilitate Final 9.3 Miles of the Going-To-The-Sun Road and Replace Bridge Over Mcdonald Creek
Renovation, Term Contract
Design
West Glacier, MT 59936

North Fork of the Flathead River
New Construction
Bidding
MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Bidding

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Post-Bid
Poplar, MT 59255

Lake Elmo C Fluminea Eradication
Infrastructure
Post-Bid
$494,506 est. value
Billings, MT 59105

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Jct Sec 462 - East and West Nh-Nhpb 57-5(47)230
Infrastructure
Bidding
MT

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

East of East Helena - East Nh 8-2(99)53
Infrastructure
Bidding

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Sf 119 - Slope Flatten S-206 Hsip 206-1(8)0
Infrastructure
Bidding
MT

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Last Updated 11/12/2021 03:29 AM
Project Title

Grade, Gravel, Plant Mix Surfacing, and Seal and Cover on US-HWY 89

Physical Address View project details and contacts
City, State (County) MT   (Park County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Alignment shift for the installation of a two-way-left-turn-lane (TWLTL), approach work, reconstruction and overlay of the adjacent shared use path, construction of a retaining wall, and the installation of a subsurface trench drain. The project starts at RP 49.7 near the junction with State Secondary Route 540 and continues northerly along US HWY-89 to its end at RP 52.5 near Merrill Ln.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents