Similar Projects
I-10: Bonnet Carre Spillway Emer Re Ph 2
Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Saint Rose, LA 70087

I-10: Bonnet Carre Spillway Emer Re Ph 2
Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Saint Rose, LA 70087

Des Allemands Phase 1 Bulkhead
Infrastructure
Bidding
$800,000 CJ est. value
Des Allemands, LA 70030

Des Allemands Phase 1 Bulkhead
Infrastructure
Bidding
$800,000 CJ est. value
Des Allemands, LA 70030

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

2022 District 12, 13, 14 Road Improvements
Infrastructure
Results
$1,366,416 est. value

2022 District 7, 9 Road Improvements
Infrastructure
Results
$2,493,427 CJ est. value
Mandeville, LA 70448

Willowdale Blvd: US 90 - E. Heather Dr.
Infrastructure
Design
$500,000 CJ est. value
Boutte, LA 70039

Engineers Canal Phase 1 Bank Stabilization
Infrastructure
Bidding
$1,985,500 CJ est. value
Norco, LA 70079

Lift Stations Backflow Preventative Maintenance Service
Renovation, Infrastructure
Post-Bid
Reserve, LA

Automated Water Meter Reading Installation Program
Infrastructure
Results
$687,155 CJ est. value
Hahnville, LA 70057

LaBranche Shoreline Protection Project
Infrastructure
Bidding
$6,000,000 CJ est. value
Luling, LA 70070

Scooter's Coffee / Luling
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Luling, LA 70070

West Bank Bridge Park Improvements, Phase I
Infrastructure
Results
$1,874,500 CJ est. value
Luling, LA 70070

Last Updated 12/26/2023 09:35 AM
Project Title

Highway 61 Streetscape Improvements

Physical Address View project details and contacts
City, State (County) Norco, LA 70079   (Saint Charles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

OJT Goal: 2 Trainees Specbook: 2016 Clearing and grubbing, grading, drainage structures, sidewalks, concrete and asphalt drives, landscaping, cabled articulated concrete block mattress, sewer and water line relocation, and related work. Parish(es): St. John the Baptist Route(s): US 61 Federal Number: H013239 Estimated Construction Cost: $2,500,000 to $5,000,000 All Questions Concerning the Plans Shall Be Submitted via the Electronic Plans Distribution Center Known as Falcon. All Submitted Questions Will Be Forwarded by Email to the Project Manager and the Project Engineer. Questions Submitted Within a Period of 96 Hours Prior to the Advertised Time for the Opening of Bids, Excluding Saturdays, Sundays, and Any Other Legal Holidays, May Not Be Answered Prior to Bidding. Falcon May Be Accessed via the Internet. From the Home Page, Select Business Working With Dotd, Then Select Project Letting Info. On the Construction Letting Information Page, Select the Link, Dotd (Falcon); Login to Falcon (or Request an Id if a First-time User). Once Logged in, You Will Have Access to View Project Information, Submit a Question Concerning the Project, and View the Plans. To Avoid Any Suggestion That a Potential Bidder is Using the Falcon System to Communicate With Other Potential Bidders, Dotd Will Not Post Any Question or Any Statement of Fact or Opinion Not Made for the Purpose of Seeking Clarification of Plans and/or Specifications. Any Non-questions Posted on Falcon Will Be Limited to the Statement of an Issue Considered Unresolved by a Previous Dotd Response. LADOT - Highway 61 Streetscape Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (28%), WBE (7%),

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents