Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Tower Grove Park - City of St. Louis
Infrastructure
Conception
$2,886,599 CJ est. value
Saint Louis, MO 63110

Moxy Hotel by Marriott / Saint Louis
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Saint Louis, MO 63101

Olive West Residential
New Construction, Renovation, Infrastructure
Design
$25,000,000 CJ est. value
Saint Louis, MO 63108

Bennington Place-McKelvey Road-Ameling Road Resurfacing
Infrastructure
Bidding
$216,400 CJ est. value
Saint Louis, MO 63103

EHRM Infrastructure Upgrades Design John Cochran
Infrastructure
Bidding
$20,000,000 CJ est. value
Saint Louis, MO 63106

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Phase I - Center Redevelopment Welcome and Wellness Center
Demolition, New Construction, Infrastructure - 24,100 SF
Post-Bid
$10,000,000 CJ est. value
Saint Louis, MO 63120

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Results
$711,651,970 CJ est. value
Saint Louis, MO 63107

Cervantes Convention Center Expansion and Modernization Project 1
Addition, Demolition, Renovation, Infrastructure
Construction
$123,867,709 CJ est. value
Saint Louis, MO 63101

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

Ponce Health Sciences University Medical School
New Construction, Infrastructure - 150,000 SF
Pending Verification
$80,000,000 CJ est. value
Saint Louis, MO 63101

O'Fallon Park - City of St. Louis
Infrastructure
Conception
$1,019,234 CJ est. value
Saint Louis, MO 63147

Last Updated 05/23/2023 09:03 AM
Project Title

Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2023) Contract E

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63103   (Saint Louis City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,853,948 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that The Metropolitan St. Louis Sewer District (District), the Owner, will receive sealed bids for Bissell - Coldwater - Missouri - Meramec Public I/I Reduction (2023) Contract E under Letting No. 12587-015.1, The Work to be performed under these Contract Documents consists of: The work to be done under this contract consists of the rehabilitation of approximately 44,078 lineal feet of sanitary sewers, varying in size from 6-inches to 36-inches in diameter, utilizing cured-in-place-pipe (CIPP) methods, 27 manholes, 756 service connections, and 34 point repairs. The project is within the Metropolitan St. Louis Sewer District Boundaries, inside the Cities of Ballwin, Fenton, Ladue, Manchester, and Valley Park, in the State of Missouri. The work will be performed in various quantities at various sites. All prospective bidders must prequalify in the Cured-In-Place Pipe (CIPP) category, and be certified prior to the Bid Opening. Prequalification forms for obtaining said certification may be obtained from the Owner at the above mentioned address. All bidders must obtain drawings and specifications in the name of the entity submitting the bid. This project will be financed through the Missouri State Revolving Fund, established by the sale of Missouri Water Pollution Control bonds and Federal Capitalization Grants to Missouri. Neither the Missouri Department of Natural Resources, its divisions, nor its employees will be party to the contract at any tier. Any Bidder whose firm or affiliate is listed on the GSA publication titled "List of Parties Excluded from Federal Procurement or Non-Procurement Programs" is prohibited from the bidding process; bids received from a listed party will be deemed non-responsive. Refer to Instructions to Bidders B-27 for more information regarding debarment and suspension. Nondiscrimination in Employment: Bidders on this work will be required to comply with the President's Executive Order 11246. The Metropolitan St. Louis Sewer District is an Equal Opportunity Employer. The Metropolitan St. Louis Sewer District is an Equal Opportunity Employer and All Bid Openings conducted via teleconference using the information below: PHONE: Toll Free Dial-In Number: 866-705-2554 Conference Code: 591849 Contact the Project Engineer, Jared Barr, at 314-335-2063, Regarding Technical Questions. Please Contact Stacey Hunter in the Purchasing Department at 314-436-8738 for Bidding Information on This Project. If You Have Questions or Recommendations Concerning the District's Mwbe Program, Please Contact Shonnah Paredes, Manager of Diversity Programs, at (314)768-6395 or by Email at Sparedes@stlmsd.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents