Similar Projects
Last Updated | 01/13/2022 10:44 AM |
Project Title | Sun Valley Parkway Restoration Phase 4 |
Physical Address | View project details and contacts |
City, State (County) | AZ (Maricopa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of full depth milling of the existing asphalt pavement and replacing with five inches new asphalt pavement (1.5 inches PMTR of ½ inch Super pave for Low Traffic on 3.5 inches of ¾ inch Super pave for High Traffic) on existing Aggregate Base. Re-grading existing aggregate base, proof rolling, installation of pavement markings, dispose of millings at two stockpile locations and other miscellaneous work is included in this project. The project length is approximately 3.5 miles. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |